Laserfiche WebLink
1 <br /> 1 <br /> A Ar <br /> N s <br /> B-1/ KB2 B-2/ KB5 B-6 <br /> Mw-1 Mw-2 <br /> CL CL CLSm <br /> — <br /> SM/ -UL <br /> } ML ML <br /> SM L& 32 2 <br /> CL 8 G CL37��j SM <br /> SP ML <br /> <2.4 87 ML <br /> 1. 8.0 SP <br /> sp ML <br /> ML ML SP <br /> sm <br /> SM <br /> B B1 <br /> N S i <br /> KB1 KB3 B-3/ KB1 EXPLANATION: <br /> MW-3 _— <br /> ML 1 CL —�f 370• Concentration Of TPHg <br /> Measured In Parts Per <br /> Z 1 ML ML ML Million <br /> sM Z <br /> _ i Water Level During Drilling <br /> ML — Sm SP _ <br /> CL 239 S ~ <br /> = <br /> CL CML CL 2" � Screened Interval <br /> ML 15.8 <2-0 <br /> ML <br /> 2.8 = <br /> SM — 20 <br /> AIL <br /> 10 <br /> z <br /> 0 10 20 <br /> SCALE <br /> to feet <br /> GEOLOGIC CROSS SECTIONS pub <br /> Former Unocal Service Station Na 2859 <br /> 1685 Paclflo Avenue C-3 <br /> PROJECT NO. 58012-5 Stockton, Calliornla <br /> i <br />