Laserfiche WebLink
A K8-1 MW-1 TANK EXCAVATION <br /> A+ ' <br /> 0 (proj) (Prof) KB-2 VW-2 MW-2 <br /> / a ro (prol) (pro? <br /> 10 <br /> LE <br /> ],9001 5 <br /> TANK COMPLEX BACKFIL <br /> ' O% % ® PRIMARILY l INE GRAINED DEPOSITS-SILT AND CLAY <br /> U 20 PRIMARILY COARSE GRAINED DEPOSITS-SAND <br /> ;•. _ / =:. 10 m <br /> U ]�`SINR� <br /> NDLN /Z <br /> ' ' MW-2 SOIL BORING/MONITORING WELL LOCATION AND <br /> DESIGNATION <br /> rn 17.30013.4 28ad <br /> - 7.81ND 1811.72 4 z • SOIL SAMPLE LOCATION ANO DESIGNATION <br /> Q 30 c r D o <br /> 0 1.40010 27:; ::.:::7 20 p Proj PROJECTED ONTO LINE OF SECTION <br /> w <br /> 7 GRovNOklk> / % w = STATIC WATER LEVEL ON DATE=INDICATED <br /> CoLu <br /> 7 40FwcTVAT. 13&9_1o(4 / ' u' TPH-9/BENZENE=CONCENTRATION IN SOIL,IN PARTS <br /> oNC / PER MILLION,3-25.93 <br /> 30 X10—TPH-91SOCONCENTRATION CONTOUR.IN ppb,3-25-93 <br /> 50 3�3 93 dp0"� BENZENE ISOCONCENTRATION CONTOUR IN ppb, <br /> ri' 3-2593 <br /> 1940-E94Z <br /> 12 :,. ':.`;?;•::'.r.::'}i:::`,:'':;:i:.-' NQ NOT DETECTED <br /> SAND PACKED INTERVAL <br /> 60 SCREENED INTERVAL <br /> -50 <br /> PACIFIC LE FORMER UNOCAL.SERVICE STATION 2859 <br /> ENVIRONMENTAL 1665 Pacific Avenue FIGURE <br /> GROUP,INC. HORIZONTAL:1'.10' Slockfon,Califomia\%D> 3 <br /> VERTICAL:1".10' <br /> GEOLOGIC CROSS-SECTION A-A' PROJECT: <br /> 310-40.01 <br />