Laserfiche WebLink
MW7 • <br /> !� T <br /> C1 <br /> Z • <br /> PVjaws m <br /> .{ p MW-5 <br /> p►��fJ{ MWS O SOIL BOAINGlMONITORING WELL LOCATION AND <br /> ND DESIGNATION(APPLIED GEOSYSTEMS,JUNE 1988) <br /> 10 VW-3 SOIL BORINGIVAPOR WELL(APPLIED GEOSYSTEMS, <br /> i AUGUST 1989) <br /> MW-1 19 NI2BENZENE CONCENTRATION IN GROUNDWATER, <br /> FORMER STORAGE 1` <br /> IN PARTS PER BILLION(ppb),5.29-91 <br /> TANK COMPLEX , sl i0^ BENZENE ISOCONCENTRATION CONTOUR IN ppb, <br /> VW-1 VW-2 �• N� IA W�i t� PV` N2 NOT DETECTED <br /> MW3 P►1► V NS NOT SAMPLED-WELL DAY <br /> FORMER STATION FORMER P VCT <br /> BUILDING ISLAND NA NOT APPLICABLE,WELL NOT EXISTING AT THIS DATE <br /> 1 <br /> 1 MW6© 4 �' <br /> 1 NA <br /> 1 _ FORMER WASTE/ <br /> 1V/ <br /> -OIL TANK <br /> APPROXIMATE DIRECTION <br /> OF GROUNDWATER FLOW <br /> PACIFIC FORMER UNOCAL SERVICE STATION 2859 <br /> ENVIRONMENTAL SCALE 1665 Pacific Avenue FIGURE: <br /> Stockton,California <br /> . GROUP,INC. 0 40 80 FEET PROJECT: <br /> BENZENE CONCENTRATION MAP-MAY 29,1991 310-040.6A <br />