My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
1665
>
3500 - Local Oversight Program
>
PR0545638
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 11:10:28 AM
Creation date
5/5/2020 11:04:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545638
PE
3528
FACILITY_ID
FA0005998
FACILITY_NAME
UNION OIL SS#2859
STREET_NUMBER
1665
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
13702031
CURRENT_STATUS
02
SITE_LOCATION
1665 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCAUIS GERAGHTY&MILLER <br /> REPORT <br /> Following completion of the scope of work proposed in this workplan, an <br /> investigation report and CAP will be prepared and submitted to the SJCPHS. The <br /> report will summarize field methodologies used along with findings and conclusions <br /> for this investigation. The report will also contain tables summarizing analytical <br /> results, a site map showing the piezometer location, boring log and piezometer <br /> construction details, copies of all necessary permits to perform the proposed scope <br /> of work, copies of all analytical results, and the CAP. As indicated above, the CAP <br /> will include an assessment of the vertical and lateral groundwater impacts in the site <br /> vicinity, a feasibility study, and applicable cleanup levels. <br /> SCHEDULE <br /> Unocal and its consultant will proceed with this scope of work following <br /> receipt of written approval of this workplan from the SJCPHS. It is anticipated that <br /> fieldwork will commence within two weeks following receipt of all applicable <br /> permits. The report will be submitted to the SJCPHS within eight weeks following <br /> receipt of all investigation data. <br /> If you have any questions or comments regarding this workplan, please <br /> contact Dr. Stephen Cu!len at(805)687-7559. <br /> Sincerely, <br /> ARCADI eraghty&Miller, Inc. <br /> ��inhar 0uhrnke <br /> Project cientist <br /> v� <br /> Wa e Allmon, R.G.No. 6386 <br /> Principal Scientist <br /> Dr. Ste en u en,Ph.D. <br /> Principal Scientist <br /> Attachments: Figures 1 &2 <br /> Field Methodology <br /> Our ret.: Page: <br /> %%GM_SANTA_BARBARAIDATAWPRO_SBOIUNOCALIC_VALLEYIWPS_REVIPACWKP2A.DOC 8/11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.