Laserfiche WebLink
- STANDARD OPERATING PROCEDURE - , <br /> e <br /> GROUNDWATER SAMPLING <br /> Gettler-Ryan Inc field personnel adhere to the following procedures for the collection and handling of <br /> groundwater samples prior to analysis by the analytical laboratory Prior to sample collection, the type <br /> of analysis to be performed is determined Loss prevention of volatile compounds is controlled and <br /> sample preservation for subsequent analysis is maintained. r _ - <br /> m <br /> Prior to sampling, the presence or absence of free-phase hydrocarbons is determined using an interface <br /> probe Product thickness, if present,is measured to the nearest 0.01 foot and is noted in the field notes <br /> In addition,static water level measurements are collected with the interface probe and are also recorded <br /> in the field notes <br /> After water levels are collected and prior to sampling, each well is purged a minimum of three well <br /> casing volumes of water using pre-cleaned pumps (stack, suction, Grundfos), or polyvinyl chloride <br /> bailers Temperature,pH and electrical conductivity are measured a minimum of three times during the <br /> purging. Purging continues until these parameters stabilize <br /> Groundwater samples are collected using disposable bailers The water samples are transferred from the <br /> bailer into appropriate containers Pre-preserved containers,supplied by analytical laboratories,are used . <br /> when possible When pre-preserved containers are not available,the laboratory is instructed to preserve <br /> the sample as appropriate Duplicate samples are collected for the laboratory to use in maintaining <br /> quality assurance/quality control standards The samples are labeled to include the Job number, sample <br /> identification collection date and time;analysis;preservation(if any);and the sample collector's uutials.T - -----The-water s les are placed in a cooler, maintained at 4oC for transport to the laboratory. Once <br /> collected in the field,all samples are maintained unde-chain of custody untiYdehvered to the a orato <br /> The chain of custody document includes the job number,type of preservation,if any,analysis requested, <br /> sample identification,date and time collected, and the sample collector's name. The chain of custody is <br /> signed and dated (including time of transfer) by each person who receives or surrenders the samples, <br /> beginning with the field personnel and ending with the laboratory personnel. <br /> A laboratory supplied trip blank accompatues each sampling set For sampling sets greater than 20 <br /> samples,5%trip blanks are included The trip blank is analyzed for some or all of the same compounds <br /> as the groundwater samples. <br /> As requested by Unocal Corporation, the purge water and decontamination water generated during <br /> sampling activities is transported to Tosco-San Francisco Area Refinery,located in Rodeo,California <br /> hVorm'anocaltop frm-5100 <br /> • <br />