My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012310
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
1665
>
3500 - Local Oversight Program
>
PR0545638
>
ARCHIVED REPORTS_XR0012310
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 1:05:08 PM
Creation date
5/5/2020 12:02:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012310
RECORD_ID
PR0545638
PE
3528
FACILITY_ID
FA0005998
FACILITY_NAME
UNION OIL SS#2859
STREET_NUMBER
1665
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
13702031
CURRENT_STATUS
02
SITE_LOCATION
1665 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ell�yt® <br /> 16 Ms Margaret Lagono <br /> February 5, 2004 <br /> Page 4 <br /> ' exception of four sampling events The four detections of petroleum hydrocarbons In well NP-1 <br /> may be due to the desorption mechanism mentioned previously ENSR will continue to monitor <br /> well NP-1 to assess whether or not this is occurring <br /> Recommendations <br /> ENSR recommends that operation of the Ozone Pilot Test system be continued and further <br /> 1 groundwater sampling be performed to evaluate the system's effectiveness Additionally, ENSR <br /> recommends the continuation of the groundwater monitoring and sampling program in <br /> accordance with SJCEHD letter dated December 30, 2003 <br /> Future Work <br /> 1 ENSR will continue to troubleshoot the treatment system in order to limit system down time <br /> The first quarter groundwater monitoring and sampling is scheduled for February 2004 <br /> Historical soil sample analytical data will be reviewed to assess potential sources of 1,2-DCA in <br /> soil beneath the site If required, a work plan will be prepared to assess the site as a possible <br /> source of 1,2-DCA during second quarter 2004 <br /> Remarks/Signatures <br /> The interpretations in this report represent our professional opinions and are based, in part, on <br /> the information supplied by the client These opinions are based on currently available <br /> information and are arrived at in accordance with currently accepted hydrogeologic and <br /> engineering practices at this time and location Other than this, no warranty is implied or <br /> Intended <br /> J\Projects\o69401357-2859\Final\Reports\4th Qtr 2003-QMR-RSR doc <br />' 35 Years of Excellence rn Environmental Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.