My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012389
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
1665
>
3500 - Local Oversight Program
>
PR0545638
>
ARCHIVED REPORTS_XR0012389
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 12:59:22 PM
Creation date
5/5/2020 12:34:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012389
RECORD_ID
PR0545638
PE
3528
FACILITY_ID
FA0005998
FACILITY_NAME
UNION OIL SS#2859
STREET_NUMBER
1665
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
13702031
CURRENT_STATUS
02
SITE_LOCATION
1665 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t' <br /> Quarterly Summary Report <br /> Second Quarter 1999 <br /> Farmer Unocal Service Station 2859 <br /> 1665 Pacific Avenue <br /> Stockton, California <br /> County STID # None <br /> County San Joaquin <br /> BACKGROUND <br /> Underground storage tanks removed in March 1988 From March 1988 through <br /> November 1994, a total of 12 on-site and 3 off-site borings were drilled, 4 on-site moni- <br /> tonng wells, 3 on-site soil vapor extraction (SVE) wells, and 5 off-site monitoring wells <br /> were installed Analytical results indicate that soil near the eastern dispenser island <br /> contains gasoline hydrocarbons and groundwater has been impacted with gasoline <br /> hydrocarbons A work plan to initiate a SVE pilot test was submitted on July 14, 1995 <br /> A 30-day public notification for air permitting was initiated, and an air permit to construct <br /> was received in December The SVE remedial system was constructed in January 1996 <br /> The SVE pilot test was run from January through November 1996, during which time it <br /> removed nearly 2,800 pounds of hydrocarbons <br /> RECENT QUARTER ACTIVITIES <br /> Field work to implement a scope of work presented in a fourth quarter 1998 workplan <br /> was performed Second quarter groundwater monitoring and sampling was also <br /> performed during this reporting period <br /> NEXT QUARTER ACTIVITIES <br /> Second quarter 1999 groundwater monitoring report will be issued and sampling will be <br /> performed <br /> 3100405A/2g99QSR 1 July 20, 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.