Laserfiche WebLink
i <br /> AGE-INC-95-0j-73 j73 <br /> Project: California Fuels Cardlock Station Project No.: BORING NO.: r <br /> Site Address: 2402 Pacific Avenue Total Depth. 35-feet V <br /> Stockton, CA Date: 16 .Tune 1997 <br /> ;I <br /> Drilling Co.: Mitchell Drilling Logged by: T. Cuellar k Page I of I <br /> Rig/Auger Type: CME-7518-inch hollow stem augers Reviewed by: N. Henderson <br /> \Y <br /> itlialagrc ...s <br /> I' <br /> I _ 1 <br /> I <br /> VW2-5 - - - - No sample collected. f <br /> 10— V W2-10 - - - - No sample collected. <br /> - - - <br /> VW2-15 o sample collected. <br /> 'E <br /> 20— VW2-20 497 12/13/15 ML Brown,moist, stiff, silt <br /> – Moderate petroleum hydrocarbon(IAC}odor'. <br /> i <br /> h d ; <br /> VW2-25 516 11/13/17 ML Mottled brown and gray,moist stiff, silt. <br /> Moderate HC odor. <br /> SMBrown <br /> I' ,v <br /> �. ery moist,medium dense, silty fine sand. <br /> 30— VW2-30 547 11/15/17 S-W o ' • ' . Brown,very moist,medium dense,fine to medium sand. <br /> Slight HC odor. <br /> 'k <br /> VW2-35 113 12/15/16 ML Brown, saturated,medium dens"e,_sitty fide sand.Faint HC odor. <br /> Notes: �M <br /> Boring VW-2 terminated at a total depth of 35-feet below site <br /> grade(bsg). Groundwater enco61cied at 30-feet bsg.VW-2 <br /> completed as 2-inch diameter soil vapor extraction well.Refer to <br /> 40---- Figure 4 far as-built construction' details. <br /> Advanced it <br /> GeoEnyironmental, Inc.. <br /> ,� .. <br />