Laserfiche WebLink
I <br />' 16 June 2004 <br /> AGE-NC Project No 95-0173 <br />' Page 3 of 9 <br />' ethyl tert butyl ether(ETBE), 1,2-dichloroethane(1,2-DCA)and ethylene-dibromide(EDB) <br /> by EPA Method 5030/8260B <br />' 3.0. SOIL VAPOR EXTRACTION/IN-SITU AIR SPARGE SYSTEM <br />' Between 09 September 2003 and 03 November 2003, SVE remediation was in operation at the site <br /> utilizing a Solleco Ecat 250 catalytic converter vapor extraction system to apply an induced vacuum <br /> to wells VW-1 through VW-4, during SVE operation, IAS remediation was continued with air <br /> spargmg through well AW-1B SVE and IAS procedures for the site were described in the AGE- <br /> prepared Remedial Action Work Plan dated 30 December 1998, and approved by the SJCEHD by <br /> letter dated 20 April-1999 <br /> ,Lower, <br /> en 03 and 17 November 2003, all SVE and IAS operations were temporarily suspended at the <br /> that the cata ytic oxidizer SVE system could be replaced with a more energy efficient, <br /> rative vacuum blower and carbon canister system,the new SVE system comprised of one 41/2- <br /> regenerative vacuum blower and two-1,000 pound carbon canisters SVE system <br /> ment procedures for the site were described in the AGE-prepared Proposed Modifications <br /> Vapor Extraction System, dated 03 November 2003, and approved by the SJCEHDby_lcttc <br /> 0 December 2003 _ -- - ----- - — �� <br /> Between 17 November 2003 and 30 December 2003, SVE remediation at the site was resumed <br /> utilizing the above referenced regenerative vacuum blower and carbon canister system by applying <br /> an induced vacuum to wells VW-1 through VW-4, during SVE operation, IAS remediation was <br /> continued with air sparging through well AW-2B <br /> 3 1 REMEDIATION SYSTEM PROCEDURES <br /> rA manifold network of two-inch diameter, schedule 80 PVC piping is installed underground from <br /> SVE wells VW-1 through VW-7 to the inlet of the SVE remediation system <br /> In order to monitor efficiency of the SVE system, 1) a Magnehelic vacuum gauge (Dwyer DS-200 <br /> flow sensor) was installed prior to the inlet of the SVE unit so that air flow is monitored, the flow <br /> rate was determined from the measured differential pressure and the piping diameter using a <br /> nomograph (Appendix B), 2) SVE air flow of the influent and effluent streams were monitored <br /> routinely for the presence of organic vapor using an organic vapor analyzer(OVA) equipped with <br /> a photo-ionization detector(PID Thermo Environmental 580B, 10 0 eV,calibrated to isobutylene), <br /> and 3) influent and effluent air flow vapor stream samples were collected from sampling ports <br /> 1 <br /> Advanced CcoEnvironmental,Inc <br /> I <br />