My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012524
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
2402
>
3500 - Local Oversight Program
>
PR0545640
>
ARCHIVED REPORTS_XR0012524
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 2:39:01 PM
Creation date
5/5/2020 2:00:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012524
RECORD_ID
PR0545640
PE
3528
FACILITY_ID
FA0003900
FACILITY_NAME
PACIFIC PRIDE COMMERCIAL FUEL
STREET_NUMBER
2402
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
12506001
CURRENT_STATUS
02
SITE_LOCATION
2402 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS (Continued) <br /> x <br />' <br /> 72 EX-SITU TREATMENT OF IMPACTED SOIL 15 <br /> 7 2 1 Excavation 15 <br /> 7 2 2 Feasibility of Excavation 15 <br />' 7 2 3 Estimated Costs for Excavation 16 <br /> 73 IN-SITU BIOREMEDIATION 16 <br /> 73 1 Principles 16 <br /> 7 3 2 Nutrient Requirements and Toxicity 17 <br /> 7 3 3 Inoculation Wells 17 <br /> 734 Monitoring Activities 17 <br />' 7 3 5 Duration 18 <br /> 7 3 6 Feasibility 18 <br />' 7 3 7 Estimated Costs for In-Situ Bioremediation 18 <br /> 74 NATURAL ATTENUATION 18 <br /> 7 4 1 Principles 19 <br />' 7 4 2 Duration 19 <br /> 7 4 3 Feasibility 19 <br /> 744 Estimated Costs 20 <br /> 8 0 GROUND WATER REMEDIATION ALTERNATIVES 20 <br /> 8 1 IN-SITU AIR SPARGING 20 <br />' 811 Principles 20 <br /> 8 1 2 Basic System Design 20 <br /> 8 1 3 Monitoring Activities 21 <br />' 814 Feasibility 21 <br /> 815 Duration 22 <br /> 816 Cost 22 <br />' 82 GROUND WATER EXTRACTION 22 <br /> 82 1 Basic Principles 22 <br /> 8 2 2 Treatment Methods 23 <br /> 8 2 3 Feasibility Testing 23 <br /> 8 2 4 Duration 23 <br />' 8 2 5 Cost 24 <br /> 83 IN-SITU BIOREMEDIATION/BIOENHANCEMENT 24 <br /> 83 1 Basic Principles 24 <br /> 8 3 2 Nutrient Requirements and Toxicity 24 <br /> 83 3 Monitoring Activities 24 <br /> 8 3 4 Feasibility Studies 25 <br />' <br /> 83 5 Duration 25 <br /> 83 6 Cost 25 <br /> n r ' <br /> 84 NATURAL ATTENUATION <br /> 8 4 1 Principles 26 <br /> . 8 4 2 Duration 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.