Laserfiche WebLink
DIVISION 2 SITE WORK <br /> SECTION 02672 <br /> ` PIEZOMETERS AND SOIL VAPOR MONITORING PROBES <br /> PART1 GENERAL <br /> 1.1. SCOPE <br /> This section specifies requirements for installation and sampling,construction <br /> materials,drilling and well-head protection of Piezometers and Solid Vapor <br /> Monitoring Probes. <br /> 1.2 SUBMITTALS <br /> A. Well Permits <br /> B. Proof of State license to perform work covered by this Section. <br /> C. Laboratory analytical data for characterization of solids and fluids generated <br /> during the Work for disposal profiling. <br /> D. Transport manifests for solids and fluids disposed off-Site. <br /> E. Proposed disposal facility for solids and fluids. <br /> 1.3 QUALIFICATIONS <br /> A. Drilling and Vapor Probe Installation Firm: Company specializing in performing <br /> work of this Section with minimum 5 years documented experience and a C-57 <br /> Contractors license. <br /> 1.4 QUALITY ASSURANCE <br /> A. Perform Contract Work in accordance with monitoring provided by the Engineer <br /> and regulatory reviewing agency. <br /> 1. Assist Engineer in recording actual locations of ground water <br /> piezometers and soil vapor monitoring probes,depths,subsoil strata and <br /> drilling difficulties encountered. <br /> 2. Submit signed copy of drillei s log book statements. <br /> PART 2 PRODUCTS <br /> 2.1 GROUND WATER PIEZOMETER <br /> A. Ground Water Piezometer: <br /> 1. Blank Well Casing: Two (2) inch diameter,schedule 40 poly-vinyl <br /> chloride (PVC), flush threaded. <br /> _._....__.- 0'_672.1 ERM 10/98 <br />