My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 7
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
720
>
2900 - Site Mitigation Program
>
PR0009049
>
COMPLIANCE INFO_FILE 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 2:49:30 PM
Creation date
5/5/2020 2:05:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 7
RECORD_ID
PR0009049
PE
2960
FACILITY_ID
FA0004041
FACILITY_NAME
UP TRACY RAIL YARD
STREET_NUMBER
720
Direction
E
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25001014
CURRENT_STATUS
01
SITE_LOCATION
720 E SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 1 <br /> INTRODUCTION <br /> This Remedial Design and Implementation Plan (RDIP) was prepared by <br /> ERM-West, Inc., (ERM-West) on behalf of the Union Pacific Railroad <br /> Company (UP) regarding the Union Pacific Tracy Yard (site). The RDIP is <br /> being submitted to the California Regional Water Quality Control Board, <br /> Central Valley Region (RWQCB) in general compliance with Cleanup and <br /> Abatement Order (CAO) No. 92-707, dated September 8, 1992. In <br /> fulfillment of the CAO, this RDIP presents the remedial action design and <br /> the construction implementation plan for installation of a remediation <br /> treatment system for soil and ground water at the site. <br /> Remedial Action Objectives <br /> The objectives of this remedial action are: <br /> • To remove chemical constituents in vadose zone soil which represent a <br /> source of impacts to A-zone ground water at the site; <br /> • To remove floating product at the site which represents a source of <br /> petroleum hydrocarbon impacts to A-zone ground water; and <br /> • To control the migration of the VOC plume in A-zone ground water by <br /> ground water extraction and treatment. <br /> A detailed discussion of these objectives is provided in Section 4 of this <br /> RDIP. <br /> Description of Remedial Action <br /> The remedial action which will be implemented at the site includes three <br /> basic components: <br /> • Dual Phase Extraction: Eight dual phase extraction wells will be <br /> installed at the site. Each dual phase extraction well is capable of <br /> the simultaneous extraction of soil vapor, ground water and <br /> 1-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.