Laserfiche WebLink
f <br /> Sao, <br /> CHRONOLOGY <br /> Pacific Mini Mart <br /> 4511 Pacific Ave., Stockton <br /> 02/19/91 A Notification of Hazardous Waste Discharge was filed this date due to a release of <br /> hydrocarbons from a leaking product line at the north dispenser island at the site. <br /> 02/20/91 Falcon Energy, a Stockton environmental services firm, repaired the leaking product <br /> line and dug a trench measuring 20' long by 2' wide. Falcon Energy retained <br /> Geological Audit Services, Inc., to assess the extent of contamination in which two <br /> soil samples were collected. The results for these samples showed concentrations of <br /> 100 and 13,000 ppm total petroleum hydrocarbon quantified as gasoline (TPH-g) and <br /> 1 ppm and 140 ppm Benzene. <br /> 02/25/19 Date of report prepared by Falcon Energy which discusses the work done on <br /> 2120191. <br /> 02/26/91 Date of unauthorized release report. <br /> 03/05/91 Date of the soil sampling report prepared by Resna Industries Water Work Corp. that <br /> describes the results of the soil samples taken on 2120191. <br /> 10119-20192 Dates that four soil borings, B-1 through B-4, were advanced to a total depth ranging <br /> between 25 and 70 feet below surface grade (bsg) to conduct additional site <br /> assessment. B-1 was converted to Vapor well VW-1. <br /> 11/09/92 Date of report titled Preliminary Assessment of Hydrocarbon Contamination that <br /> discusses the site assessment done in October 1992. <br /> 1/21-25193 Three soil borings, B-5 through B-7, were advanced to total depths of 70-78 feet, <br /> then converted to MW-1 through MW-3 during this time. <br /> 09/20/93 Date the Environmental Health Department (EHD) received First Quarter 9993 <br /> Project Status Summary that discusses the results of work conducted in January <br /> 1993. <br /> 12/21/93 Date a vapor extraction pilot test was conducted by Geological Audit Services, Inc. <br /> The test did not provide conclusive data on the radius of influence of VW-1. <br /> 12/27/93 Date of Fourth Quarter 1993 Project Report that discussed the vapor extraction pilot <br /> test conducted on 12121193. <br /> 04/08/94 Six underground storage tanks (UST's) were removed from the site on this date. A <br /> total of 19 soil samples were collected from the tank excavation and stockpiles. <br /> Results of soil samples showed concentrations as high as 3,000 milligrams per <br /> kilogram (mg/kg) TPH-g. In May 1994, two 12,000 gallon USTs and associated <br /> piping were installed. 638 tons of impacted soil were removed from the site and <br /> disposed at Forward Landfill. <br /> 04/30/94 Date of Underground Storage Tank Removal Report that discusses the work done <br /> on 418/94. <br />