My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4511
>
3500 - Local Oversight Program
>
PR0545641
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 3:06:11 PM
Creation date
5/5/2020 2:11:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0545641
PE
3528
FACILITY_ID
FA0002480
FACILITY_NAME
SHOP N GO 3
STREET_NUMBER
4511
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11023011
CURRENT_STATUS
02
SITE_LOCATION
4511 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chronology Page 3 <br /> 4511 Pacific Ave., Stockton <br /> 10/12/01 Date that the GWE remediation system was initiated. <br /> 214-5103 Two monitoring wells MW-17 and MW-18 were installed off site to further delineate <br /> the MTBE ground water plume during this time. <br /> 'l-0/10/03 Date of Quarterly Report— First Quarter 2003 that reports February 2003 work. <br /> 12/19/03 Date of Remedial Action Work Plan that discusses a proposal to install an additional <br /> GWE well and three soil-vapor extraction (SVE) wells and an SVE system. <br /> 12/23/03 Date of the EHD letter approving the Remedial Action Work Plan dated 12119103. <br /> 03/15/04 One additional GWE well and three soil-vapor extraction (SVE) wells (EW-2, VW-2 <br /> through VW-4) were installed at the site on this date. <br /> i <br /> 08/06/04 Date of Quarterly Report — First Quarter 2004 that discusses work conducted on <br /> 3115104. <br /> 01/13/05 Date of initiation of the SVE remediation system. A total of 5,806 lbs of gasoline were <br /> removed from the site during its time of operation <br /> 04/10/06 Date of the EHD letter approving shut down of the GWE system. <br /> 04/18/06 Date that GWE remediation system was shut down. <br /> 08/06/07 Date that SVE system was shut down. <br /> 08/07/07 Date of Work Plan Addendum (Remediation Plan) Soil Sampling Location. <br /> 09/05/07 Date of the EHD letter approving advancement of soil confirmation borings. <br /> 10/1-11/20/07 Dates confirmation borings B-21 through B-24 were advanced on-site. <br /> 02/19/08 Date of Soil Confirmation Remediation Report which discusses the confirmation <br /> borings which were advanced during October and November 2007. <br /> 10/29/08 Date of the EHD letter in response to the Soil Confirmation Remediation Report. The <br /> EHD directed at least two more quarters of ground water monitoring be conducted <br /> before closure would be considered. <br /> 03/27/09 Date of Quarterly Report -- First Quarter 2009 in which preparation of a closure <br /> summary report was recommended. <br /> 05/08/09 Date of the EHD letter directing that a closure summary report be submitted. <br /> 05/15/09 Date of Closure Summary Report that recommends closure of the site. <br /> k <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.