Laserfiche WebLink
' 18 October 2002 <br /> AGE-NC Project No 95-0128 <br />' Page 6 of 7 <br />' 4.4. SUMMARY AND CONCLUSIONS <br /> The following conclusions were drawn from the results of this quarterly investigation <br /> • Ground-water elevations measured during the August 2002 monitoring event ranged between <br /> 20 01 and 2177 feet below MSL, ground water flow direction at the site was Inferred to be <br />' northeast towards a well-defined cone of depression at extraction well EW-1 <br /> • Dissolved petroleum hydrocarbons quantified as TPH-g,TPH-d and BTEX compounds were <br /> detected in ground water samples MW-4, MW-5 and VW-1, collected within the <br />' northeastern portion of the site <br /> • The highest concentrations benzene (160 pg/1), toluene (170 µg/1) and ethylbenzene <br />' (1,900 gg/1) were detected in sample MW-5, these concentrations were above the DHS' <br /> Maximum Contaminant Levels (MCLs) in drinking water <br /> • The highest concentration of MTBE detected in the ground water samples (690 µg/1) <br /> occurred in monitoring well MW-5, adjacent to extraction well EW-1 Lower or non- <br /> detectable MTBE concentrations in the down-gradient and cross gradient wells defined the <br /> lie <br /> dissolved MTBE plume toward the north and west(Figure 4) The dissolved MTBE plume <br /> has not been defined east of well MW-15 <br /> • The lead scavenger 1,2-DCA was detected in sample MW-3 at 15 gg/l, slightly above the <br /> MCL of 0 5 gg/l <br /> • Approximately 0 18 kg or 0 39 lbs of MTBE, 0 16 kg or 0 35 lbs of benzene and 2 2 kg or <br /> 4 9 lbs of TPH-g were removed from the site and treated by the ground water extraction <br /> system <br /> I <br /> 5.0. RECOMMENDATIONS <br />' Based on the results of this and previous investigations, AGE recommends <br /> • Continued quarterly ground water monitoring of the site concurrently with the Pacific Car <br /> Wash site (4405 Pacific Avenue), the next monitoring event is tentatively scheduled for <br /> November 2002 <br /> I • Continued interim ground water extraction and treatment as a remedial measure, with the <br /> addition of another ground water extraction well by well MW-5 <br /> I • Assessment of the dissolved MTBE cast of wells MW-15 and MW-16 <br /> • <br /> IAdvanced GeoEnvironmental Inc <br />