My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4554
>
2200 - Hazardous Waste Program
>
PR0514049
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 3:29:26 PM
Creation date
5/5/2020 2:20:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514049
PE
2220
FACILITY_ID
FA0003824
FACILITY_NAME
WASTE RECOVERY WEST INC
STREET_NUMBER
4554
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
4554 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PURPOSE AND SCOPE OF CONTINGENCY PLAN <br /> The purpose of this plan is to minimize hazards to human health and the environment from fire, <br /> explosion, or any unplanned sudden or non-sudden release of hazardous materials to air, soil, or <br /> surface water. The plan will outline facility-specific emergency procedures that have been <br /> developed and are to be implemented in the event of an emergency hazardous waste situation. <br /> This plan has been designed to comply with the following federal regulations: <br /> • EPA's Resource Conservation and Recovery Act Contingency Planning Requirements: 40 <br /> CFR part 264, Subpart D; 40 CFR part 265, Subpart D. <br /> • OSHA's Emergency Action Plan: 29 CFR 1910.38(a). <br /> • OSHA's Emergency Response Plan: 29 CFR 1910.120(q)(2) <br /> DESCRIPTION OF PLANT OPERATIONS <br /> Operations at this plant consist of manufacturing and wholesaling of wood products. There are <br /> two main manufacturing facilities, the mill and the truss shop facility. <br /> The manufacturing facility does the following: resawing, trimming, and ripping of lumber into <br /> smaller dimensions, stacking and storing of lumber into smaller dimensions and storing lumber <br /> for wholesale; and the turning and planing of wood to produce specialty lumber products of <br /> various dimensions. <br /> FACILITY EMERGENCY RESPONSE TEAM <br /> Name Responsibilities <br /> Mark Berger General Manager of Operations <br /> Gary Thronhill Production Manager <br /> Jose Lopez Head Maintenance <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.