My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1014
>
2200 - Hazardous Waste Program
>
PR0514261
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 4:56:17 PM
Creation date
5/5/2020 4:29:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514261
PE
2220
FACILITY_ID
FA0010266
FACILITY_NAME
LUBE GUYS LLC
STREET_NUMBER
1014
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13904012
CURRENT_STATUS
01
SITE_LOCATION
1014 N EL DORADO ST
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quality Tune-Up <br /> 1014 N EI Dorado Stret <br /> Stockton, CA 95202 <br /> TANK ASSESSMENT 480 GA USED OIL HOLDING AST <br /> Facility inspection by Qaniel K. Barber RCE California and Certified Steel Tank Institute Inspector. <br /> Inspection:July 18, 2011.1 <br /> Owner Contact: Gerald)Garduno, Shop Manager Quality Tune-Up (209) 547-9084 <br /> CONTAINMENT ASSESSMENT <br /> The double wall steel AST lays horizontally within in a concrete floor equipment maintenance shop. <br /> Adequate sizing for cor tained AST is provided by a secondary welded 10 gauge (.1345 IN) plate shell. <br /> There is adequate containment capacity for failure of the 480 GA primary "hazardous waste" containing <br /> waste oil AST. The concrete floor readily supports the subject waste oil AST. <br /> Attached to the rectangular"Lube Cube" ®AST is a highly visible GRACO pneumatic 1 IN transfer pump <br /> and piping. The shop's finished concrete floor and raised AST provides a Continuous Release Detection <br /> Method (CRDM)with visible indication of spillage prior to ground contact. <br /> Daily observations for visible signs of leakage are to be recorded by Quality Tune-Up staff in keeping <br /> with the Spill Prevention Control and Countermeasures Plan. <br /> Records are to maintai ed on site for 3 years. <br />
The URL can be used to link to this page
Your browser does not support the video tag.