Laserfiche WebLink
tiN07/02/2018 19:56 510796-470 SHARMA PAGE 01 <br /> %■ <br /> ■ <br /> i■ . -J <br /> Yosemite Avenue Arco AM PM <br /> Jesse & Kul Petroleum, Inc. <br /> 1711 E. Yosemite Avenue <br /> Manteca, CA 95336 <br /> July 3, 2018 <br /> Zuna Barker Portillo RECEIVED <br /> EH Specialist <br /> San Joaquin County EHD. JUL. 0 3 20.18 <br /> 1868 E. Hazelton Ave ENVIRONMENTAL HEALTH <br /> Stockton, CA 95205 <br /> Fax: (209)464-0138 PERM)TiSERVICES <br /> Subject: Compliance Response <br /> Ref: Routine Inspection-dated June 5, 2018 <br /> A para wise response to the reference inspection is as follows: <br /> 1. Item 105: <br /> Corrections made on site as noted in the inspection report. <br /> 2. Item 209. <br /> Comments noted and discussed with the designated operator to include all of the <br /> required information on reports. <br /> 3. Item 211: <br /> The designated operator was called in and visited the site on the same day after <br /> completion of inspection.The last training was completed by the designated operator <br /> on 10/9/17 for six employees and on 5/8/18 for one employee. On the day of inspection <br /> 6/5/18,training of a new employee was also completed. The training log previously not <br /> in the right sequence is now attached in right sequence in the file. A copy of the log is <br /> attached for reference. <br /> 4. Item 301: <br /> Elite IV Services (License Contractor) were contacted and they are working with Ms. <br /> Kimberly Blackwell of your office on 6/29/18 to obtain permit for the necessary work <br /> 5. Item 315: Correction was made on site during the inspection. <br /> Attached is the dully filled Return to Compliance Certification.Thanks <br /> Sincerely <br /> 0"�-A�� <br /> Kuldeep Sharma <br /> Tel: (510)468-2371. <br /> Received Time Jul. 2, 2018 9:45PM No, 3804 <br />