My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4501
>
3500 - Local Oversight Program
>
PR0545651
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 10:19:29 AM
Creation date
5/6/2020 10:09:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0545651
PE
3528
FACILITY_ID
FA0002479
FACILITY_NAME
7-ELEVEN INC #17334
STREET_NUMBER
4501
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11017004
CURRENT_STATUS
02
SITE_LOCATION
4501 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02105/97 13:17 FAX 916 372 8781 FLUOR DANIEL GTI 1008 <br /> FLUOU DAMOM GFI <br /> TASK 2: SOIL BORINGSJSOIL SMPL ING <br /> Fluor Daniel G11 will supenhse the advancement of six hydraulically-driven jangled boringe to a true vertical <br /> depth of app mately IS feet below ground surface{BGS}using a truck-mounted direct-penetration <br /> Geopmbe-lig at the locations shown an the field snatch include as Attachment 1. Boring locations may <br /> be adjusted in the field,based on subsurface obstructions and general field conditions. The sampling rig <br /> will drive a 24nch-diameter by 2-foot-long Minless steel barrel lined with 2-inch-diameter by 64nch-long <br /> brass sample tubes or 2400t long Gear plastic tubing at each location. <br /> Soil samples will be collected from the borings at 15 feet BGS. The 15400t sample will be collected in <br /> rtaWe soil approximately 3 feet beneath the end of each of the three USTs. All sampling equipment will be <br /> steam cleaned prior to sampling the soil at each interval. Each sea sample will be screened for <br /> hydrocarbon vapors using a photoionization detector(PID). Soils encountered during dating will be logged <br /> using the Unitled Soil Classification System by a Fluor Daniel GTI field geologist,working under the <br /> supertson of a California registered geologist. One sample tube from each sampving interval will be <br /> sealed with Teflon sheets,capped,taped,labeled,and placed on ice in an insulated container. Each <br /> sample will be analyzed by a Site-certified analytical laboratory for benzene,toluene,ethyibenzene and <br /> xylenes(BTEX),methyl tert butyl-ether(MTBE).and total petroleum hydrocarbons-a"asaline(fPH-G)by <br /> EPA methods 802018015 modified,and Total Lead follovAng EPA method 6010. <br /> Using the geoprvbe technology,no soil will be generated during sampling. Water generated by steam <br /> cleaning will be contained and temporarily stored on site In DOT-approved 55-gallon drums pending <br /> characterization and disposal. <br /> TASK 3: GROUNDWATER SAMPLING <br /> Due to the shallow depth to groundwater,expected at the sl3e,groundwater may be encountered in the <br /> boreholes_ If there is sufficient groundwater recharge in the boreholes following extraction of the geopobe <br /> samp!5V rods,water samples will be collected from two water-bearing;bodPU5 and analyzed for BTEX, <br /> MTSE.and TPH-G using EPA methods 8020/8015 modiftd, if detected,the presence of MTBE in the <br /> groundwater will be confirmed using EPA method 8250. <br /> TASK 4,1 REPORT PREPARATION <br /> Fluor Daniel GTI will prepare a report Summartdng the data collected under the scope of work detailed <br /> above. The report will document the methods and results of the work,summarize laboratory analytical <br /> rosults,and includo appropriate maps. Following submittal of the summary report,Robert H.Lee and <br /> Associates will submit the Tank Reline Permit Application for review and approval by the SJCDHS. <br /> Cqb*BLA! <br /> pre.Terds-Refl"Sed A msnt WOW PIM 2 <br /> FApau:ry 3,198 <br /> Tho SmWwW Cwparation,4501 Pershing Avenue,Stacktm,CA 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.