Laserfiche WebLink
L <br /> JOB NAME 7-Eleven Store(#17334 JOB NUMBER 77EL 17334 03 0703 <br /> SITE ADDRESS 4501 North Pershing Ave START DATE 5 f ZD fO <br /> Stockton, CA DATE PREPARED 05/09/03 <br /> REPARED FpR Tom Miller PREPARED BY Brran Care <br /> WORK REQUEST FORM <br /> SCOPE OF WORK 2nd QUARTER 2003 MONITOR AND SAMPLE 5 WELLS <br /> 1 Arrive at site- Review 1 HASP, 2 work order, then call Brian Carey in Sacramento <br /> Site is an active, gasoline dispensing service station <br /> Check in with site mana er Business Phone 209 951-6745, Franchisee Man it& Gur al Grewal <br /> 2 Oen wells shown on attached table and let groundwater levels equilibrate DT W should be approximately 18 <br /> to 19 feet+or- <br /> a Monitor DTW, DTB, PT, and DO in the well shown on attached table (Top of Casing) <br /> Note calibration readings for D O meter and take D O readings in bucket with agitated water <br /> Note if well has measurable thickness of product, visually inspect with bailer <br /> 4 Usinq a Grundfos pump system, purge three casing volumes of water per well <br /> Measure&record pH, conductivity, and tem erature of the purged water from the well <br /> 5) Collect four S4)40-ml preserved VOAs from the well BTEX, TPHg, &5 Oxygenates (826013) <br /> 6 Place all purge water in a 55-gallon drum and store onsite Be sure to properly label drum <br /> Note contents of drum on field notes Note location of drum on attached site ma <br /> 7 Fill out COC and request EPA 8260B on"Standard Turnaround" <br /> 81 Deliver all samples to Kiff Analytical @ 2795 2nd Street,Suite 300, Davis, CA 95616 <br /> 530 297-4800 <br /> Call Jaff Auchterlonie in Sacramento before you leave the site (916)861-0400 ext 223 or cell(916) 825-4607 <br /> 10 Fill Out E ui ment Billing Sheet for all equipment used on the job and attach with field notes <br /> 11) Give copies of all notes and COC's to Brian Carey,ASAP <br /> 12 Bill Travel time to 77EL 17334 03 0711 <br /> Bill labor time to 77EL 17334 03 0703 (not to exceed 5 hours onsite labor) <br /> IEWIPMENT NEEDED: <br /> Health&Safety Site Plan <br /> (j X-40 ml preserved (HCI)VOAs(bring extra containers)_and cooler with ice <br /> Grunfos Pump System, pHfremplCond Meter, DO Meter, Disposable Bailers, COC's, drum labels, etc <br /> 112", 9/16', and 15/16"sockets, and other mist tools <br /> ONE 55-gallon drum <br /> GE_NE_RALINFORMATION <br /> Direct all questions to Jiff Auchterlonie, 916 861-0400 ext 223-office <br /> 00 <br /> PROJECT MANAGER, Jaff Auchterlonie AUTHORIZATION - <br /> i <br />