My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4555
>
3500 - Local Oversight Program
>
PR0545652
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 12:31:37 PM
Creation date
5/6/2020 12:22:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545652
PE
3528
FACILITY_ID
FA0003638
FACILITY_NAME
JEMCO VENETIAN CARDLOCK
STREET_NUMBER
4555
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11017001
CURRENT_STATUS
02
SITE_LOCATION
4555 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kennedy/Jenks Consultants <br /> Site Access <br /> In order to perform, the proposed work, it will be necessary to obtain access to City side- <br /> walks and neighboring privateIproperties. In the event that K/J is unable to readily obtain <br /> access to these areas, the proposed sampling locations will be revised and submitted to <br /> San Joaquin County Public Health Services, Environmental Health Division for approval. <br /> Worker Health and Safety <br /> A Site Health and Safety Plan for Kennedy/Jenks employees is enclosed. This document <br /> will be made available to other on site workers for reference purposes only. Each <br /> contractor will be responsible for the health and safety of its own employees. <br /> Schedule <br /> We intend to proceed with work as soon as we obtain.access to the neighboring property <br /> and to the public easement. We anticipate that our letter report can be completed within <br /> four weeks of our completion of the field sampling work. <br /> giWbsN94054MswWan.doc 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.