Laserfiche WebLink
AUG 20 '97 02:55PM CL EARWRTER GROUP P.5/7 <br /> C- <br /> LEARWATER <br /> CROU r, I N C. <br /> , F.eahnn ule rfe!suvirex <br /> As the Southland well may actually be installed between today and when this final analysis is <br /> completed, the consideration of the need for such a well would be rendered moot. Should the <br /> installation continue to be delayed, however, closure review should not be postponed, for the <br /> reasons provided in the preceding paragraphs. . <br /> I hope you find this analysis useful. I apologize for any redundancy included here as a result of <br /> the transfer of this file to my care. Given the requirements of the Underground Storage Tante <br /> Cleanup Fund and the sheer number of assignments we are both cbarged with, I felt a thorough <br /> evaluation of the status of this project was in order. I prefer to invest a couple of fours up front, <br /> as opposed to looking back to find that a significant undertaking was not necessary. <br /> I would like to discuss these considerations with you at your earliest convenience. I am prepared <br /> to move quickly to implement the appropriate course of action,and hope to work through some of <br /> the preparatory details with you soon. <br /> Thanks for your help with this file. I look forward to speaking with you soon. <br /> Sincerely, <br /> Clearwater Group,Inc. <br /> Mar 33. Niebanck, R_ G. <br /> President/Operations Manager <br /> cc Mr. Kelly Stradinger,Boettcher Western <br /> Ms. Kama Harrigfeld,Neumiller&Beardsley <br /> I <br />