Laserfiche WebLink
n. <br /> 1. PROBLEM kSSI SSNIENT SU11IMARY <br /> 1.1 INTRODUCTION <br /> As requested by Exxon Company, U.S.A., EA has prepared a work plan to remediate petroleum <br /> hydrocarbons in the soils and groundwater at fonder Exxon RS 7-39=31. Petroleum hydrocarbons <br /> may have been released from [lie former underground storage tanks when the groundwater level <br /> was much lower than it is at present, leaving tthc hydrocarbons in the soil column above and <br /> stranded below the water table. LA proposes to remediate the soils by extracting; vapor from <br /> existing monitoring wells and from dedicated vapor extraction wells to be installed. The <br /> groundwater will be rerncdiated by extracting groundwater from existing recovery wells and a <br /> proposed recovery well. 'Fite groundwater will be pumped from the recovery wells at a rate <br /> sufficient to dewater the area beneath and downgradient of the former tank field allowing the <br /> vapor extraction system to effect cleanup below the present water level. The extracted ground- <br /> water will be treated by stir stripping and activated carbon polishing. Both the vapors extracted <br /> from the soils via the vapor extraction wells and the effluent from the air stripper will be treated <br /> with a catalytic oxidizer to remove benzene and other petroleum hydrocarbons. Treated <br /> groundwater is proposed to be,reinjected in three wells along the western boundary of the site to <br /> limit the radius of influence of the pumping wells and to hydraulically isolate the site. Data on <br /> transmissivity of the aquifer and yield of the wells indicate that the effect Of Pumping can extend <br /> upgradient beyond the former Exxon site but can be limited by reinjecting treated water into <br /> three wells along the western boundary. Wells will also be used as venting wells, to reduce the <br /> influence of the vapor extraction system to the immediate site. <br /> 1.2 SITE DESCRIPTION <br /> 1 <br /> 'f ire site, located at 4444 Pershing Avenue in the northwest part of Stockton, is near the north <br /> bank of the Calaveras River, about 2.5 nniles from its confluence with the San Joaquin River <br /> (Figure 1). According to maps of the San Joaquin County Flood Control and Water Conserva- <br /> tion District(FCWCD), the groundwater gradient near the site is to the northeast,paralleling the <br /> Calaveras River, but groundwater pumping in the city forces water to flow in the upstream direc- <br /> tion, <br /> At present the site,on the southeast corner of Nortlr Pershing Avenue and Rosemarie Lane, is an <br /> unimproved grassy lot; all buildings and installations have been removed. The areas to the <br /> northeast and soutinvest of the site lure occupied by apartment buildings(Figure:2). Across <br /> Pershing Avenue incl Rosemarie Lane, about 100-200 feet from the site boundaries, there are <br /> Shell and 7-Eleven service stations incl office buildings. North of the site, across Rosemarie <br /> Lane,is the Chateau Convalescent llospitu!. <br /> The well inventory of the California Department of Water Resources in Sacramento indicates <br /> four wells within one-11,111'mile of the site and 10 wells within one mile. There are no wells <br /> S'S <br />