screened interval. The annular space above and between the sanded zones was filled with one <br /> foot of bentonite pellets and a cement-bentonite grout. This allows two different soil strata <br /> corresponding to the different depths of vapor extraction wells to be monitored independently. <br /> Construction details are shown in the well logs(App <br /> On 18 January one vapor extraction well(V3) was installed offsite and downgradient of the <br /> source of petroleum hydrocarbons,in Rosemarie Lane where the groundwater will be depressed <br /> by the groundwater extraction system. The well was installed to optimize vapor extraction and <br /> the removal of petroleum hydrocarbons presently trapped below the water table. In V3,ground- <br /> water was encountered in a silty clay 33 feet bgs,and the well was completed 40 feet bgs. The <br /> er. The well <br /> as constructed with <br /> borehole was drilled <br /> Schedule 40,f u h ti eaded FVC casing The well screen <br /> 2-inch diamete consisted of a 0-020- <br /> inch slotted PVC pipe. <br /> On 18 January a groundwater recovery well (RW4) was installed because nearby well MW10, <br /> er, an insufficient amount <br /> formerly proposed forgroundwaterton. t!e recovelad only 2.5 feet of ry well (RW4) and tiletmon monitoring well (MW 10) <br /> for groundwater extraction. <br /> were intended to contain a water column of at least 15 feet,but because static groundwater was <br /> yer at <br /> ut 39 <br /> RW4 was <br /> led to 45 feet, to <br /> ensure that a suffiat cient column of water wut 35 feet and a clay aould be aovailablee nt,tile well for pumping and draw- <br /> ensure that <br /> down during extraction. <br /> On 21 January 1991 one groundwater monitoring well (MW12) was installed downgradient and <br /> northeast of the site to further define the downgradient extent of the dissolved petroleum hydro- <br /> carbon plume. MW12 was completed 40 feet bgs, with 4-inch-diameter PVC casing; the screen <br /> was 15 feet long,and 25 feet of blank casing extended from the screen to the surface. <br /> On 18-19 February 1991 three soil valor extraction wells(V 1,V2,and V4)were installed at the <br /> site. Their construction was postponed pending the City of Stockton's decision on the permit for <br /> building construction at the site. Because the construction permit was refused,these wells were <br /> installed at or near the former tank field at locations that will be most effective for hydrocarbon <br /> extraction(Figure 3). <br /> Two vapor extraction wells (V2, V4)were completed 40 feet bgs with 2-inch•diamcter PVC <br /> casing,including 15-20 feet of screen. Well V 1 was completed with a 4-inch-diameter casing, <br /> including a 20-foot-long screen,so it could be used for both soil vapor and groundwater extrac- <br /> tion. If well,,RW 1 and RW2 cannot depress the water table,this well will help to dewater the <br /> soils,which are presently saturated with water that has been heavily impacted. <br /> esu-,cna9.u�vin. <br /> 7 <br />