0V
<br /> SCHEMATIC PRODUCT PIPING PLAN GENERAL NOTES
<br /> SCALE: 1" a 1Q' a
<br /> SCALE: 1" . 10' DRAWINGS M-586, MALL TANK AND E588S AND MI606 , SHALL BE PERFORMED AS SHOWN ON
<br /> OINSTALL FOUR (4) 10, 000 GALLON FIBERGLASS DOUBLE-WALL
<br /> AN)ROVIED STEEL TANKS WITH A.P. I. RONAN LEAK ALARM SYSTEM. TANKS TO BE a c U)
<br /> SET 48" MINIMUM BELOW FINISH GRADE. C a C O
<br /> TANKS ARE 8' NOMINAL DIAMETER AND SHALL BE INSTALLED = _ M E Z In Q
<br /> An2>r0val of the e pi ns extends only tO APPROXIMATELY 2'-0" APART. SES DRAWING M-586. �, `y Q. O W C I
<br /> ;rd hereon, but ■� � y v_ C 0)
<br /> eiiy Onn cion TANK ELEVATION: TO CALCULATE TOP OF TANK ELEVATION: E.Aba u .Z �? = �r �
<br /> oTdwic C t `3 pf State IaWS START WITH MINIMUM DEPTH OF VAPOR-RECOVERY LINE AT THE -� o
<br /> or locals d ,� FARTHEST DISPENSER AND SLOP 1/4" PER FOOT AND ADD 12" AT THE ■ � a pp C (n Q
<br /> - _ - TANK. ADD 13" (FOR 311 PIPE) OR 8" (FOR 2N PIPE) FOR A CHANGE W
<br /> 9 - One et pf appf Ved plans shall be available IN PIPING DIRECTION OTHER THAN 90° OR 450 . SET TANKS SLIGHTLY r- � H- U e pjj N ~
<br /> Op ( project 51,� at all times DEEPER THAN CALCULATION AS INSURANCE AND 4 FEET BELOW MINIMUM W p ZiZi C 41 Q W
<br /> S [ t'fis! d7'!B GRADE. �yx,B z°z
<br /> [ S 2 INSTALL REINFORCED CONCRETE TANK SLAB. SET MANHOLE COVERS Fd[]. w e V1 IA y
<br /> o - _ o
<br /> --- -- NVIP+t ti` 5 ' 1 i 'ri r'4'df3l0N 1-1/2" ABOVE SLAB. SLAB CROWN 1 FOOT MINIMUM CONCENTRIC. ) Q LA f7.
<br /> RS t� : SEE DETAILS ON DRAWING M-588 . Q1
<br /> F D:
<br /> 11 E TANK WITH OVERFILL o
<br /> O INSTALL FOUR INCH (4 ) FILL RISERS ON EACH
<br /> By C� . PREVENTION ON DROP TUBE AND MINIMUM FIVE 5 GALLON SPILL Q
<br /> � �-Z- CONTAINMENT BOXES (MANHOLE COVERS TO BE WATERTIGHT) . RISERS .
<br /> MUST BE GROUNDED! SEE DETAIL ON DRAWING M-586. D1 N
<br /> ITU
<br /> N a
<br /> INSTALL RISER FOR PHASE II VAPOR RECOVERY AND VENT CONNECTIONS ++
<br /> WITH EXTRACTOR TEE AND BALL FLOATS. SEE DETAIL ON DRAWING M-
<br /> W
<br /> 586.
<br /> INSTALL THREE (3) 1-1/2 HORSEPOWER SUBMERSIBLE PUMPS WITH RED N
<br /> JACKET LEAK DETECTOR (MANHOLE COVERS TO BE WATERTIGHT) . [ x
<br /> INSTALL 211 PRODUCT LINES WITHIN 3" SECONDARY CONTAINMENT moi[ O
<br /> PIPING (A.D. SMITH RED THREAD II, AMERON OR TOTAL m
<br /> _ CONTAINMENT) . SLOPE 1/4" PER FOOT BACK TO TANKS.. SEE DETAIL
<br /> - - - ON DRAWING M-588. O
<br /> INSTALL 3" MANIFOLDED VAPOR RECOVERY LINES, SLOPE 1/4" PER
<br /> FOOT FROM REGULAR TANK, AND INSTALL 2" DIAMETER VAPOR RECOVERY
<br /> MANIFOLD, SLOPING 1/411 PER FOOT PROM REMAINING TANKS TO THE
<br /> s _ REGULAR TANK. REFER TO SCHEMATIC DIAGRAM ON DRAWING M-606.
<br /> l I O
<br /> INSTALL A.P.Z. RONAN TANK/PIPING MONITOR SYSTEM WITH LEAK
<br /> MONITOR CONTROL BOX IN OFFICE EXACT LOCATION TO BE DETERMINED Z A
<br /> 8 N
<br /> IN FIELD) .
<br /> INSTALL FOUR (4) 2" SINGLE VENT LINES (ONE FOR EACH TANK) , J
<br /> p` O SLOPING 1/411 PER FOOT BACK TO TANKS. REFER TO SCHEMATIC =
<br /> A ?
<br /> p DIAGRAM ON DRAWING M-606. INSTALL 2" DIAMETER GALVANIZED VENT E.••
<br /> RISERS (ONE FOR EACH TANK) TO EXTEND A MINIMUM OF 24" ABOVE C7
<br /> ADJACENT STRUCTURE. SEE DETAIL ON DRAWING M-588 . Q
<br /> g o _4 10, INSTALL CONDUITS AND CONDUCTORS AND/OR PULL ROP28 FOR PUMPS, a UJ a Z
<br /> MONITORING EQUIPMENT, FUTURE MONITORING EQUIPMENT, AND r
<br /> DISPENSERS AS SHOWN ON . SCHEMATIC DIAGRAM ON DRAWING M-588 . 0. Q Z O
<br /> o y,16 ALL CONDUITS LEAVING CLASS I HAZARDOUS AREAS SHALL BE SEALED I- LL'
<br /> 1 PER N. E.C. AND LOCAL REQUIREMENTS.. L (/,)t O _
<br /> _ New UU—RS - US—RU SR UU: LL d
<br /> 14 TYP. -`Q 1 18 11 INSTALL ANNULAR SPACE MONITOR (MANHOLE COVERS TO BE
<br /> ____ r13TYP. - WATERTIGHT) . SEE DETAIL Oil DRAWING M-586. W_ ^ Q
<br /> �, 12 INSTALL 1" X 4" VAPOR CHECK VALVE AND CRP ON 4" PHASE I RISER, Iu Z
<br /> o I SEE DETAIL ON DRAWING M-586,. MUST BE GROUNDED! /y ; IU
<br /> 13 INSTALL PUMP RELAYS. EXACT LOCATION TO BE DETERMINED IN Q, ,c( Q I""'•
<br /> 7 8 1 I Z FIELD. -
<br /> 7 I I Q• W a
<br /> INSTALL UNDER-DISPENSER CONTAINMENT (SEE "BRAVO BOX" V I'-
<br /> W
<br /> TERMINATION DETAIL ON THIS SHEET) . SHEAR VALVE ANCHOR BOX I-
<br /> 1 I 8 t TYP 1 I AND DISPENSER CONTROL EQUIPMENT (PER DETAIL ON DRAWING M-588) . r W 4 U.
<br /> PLACE AN ACTIVE SIPHON LINE, 211 FIBERGLASS WITHIN 3" DIAMETER_ Q (1) g
<br /> s SECONDARY CONTAINMENT PIPING BETWEEN THE UNLEADED TANKS. Q
<br /> O I w a SLOPE 1/411 PER FOOT FROM THE NON-TURBINED TANK TO THE TURBINED
<br /> '
<br /> II TANK. REFER TO SCHEMATIC DIAGRAMS ON DRAWING M-588 . W V
<br /> 7 8
<br /> 08 > 16 PLACE INACTIVE SIPHON LINES, 21' FIBERGLASS WITHIN 3" DIAMETER Z (J)
<br /> I
<br /> O u� SECONDARY CONTAINMENT WITH TERMINATION END CAP FITTINGS (SEE2 Q �„
<br /> six Is
<br /> DRAWING M-586) . BETWEEN THE SUPER UNLEADED TANK AND THE W I`_ W �
<br /> I B ADJACENT UNLEADED TANK AND BETWEEN THE REGULAR TANK AND THE
<br /> �I} >I- H- u• ADJACENT UNLEADED TANK. ALL SIPHONS TO SLOPE 1/4" PER FOOT f- U 7- J
<br /> 11 ' _
<br /> TOWARD THE REGULAR TANK. REFER TO SCHEMATICS ON DRAWING M- _J r
<br /> New UU—RS US—RU 8R—UUI ' 17 PROVIDE A STATIC GROUNDING SYSTEM.. AS SHOWN ON DETAIL ON �' V
<br /> DRAWING M-606.
<br /> 0
<br /> INSTALL PIPING LEAK MONITOR AT LOW POINT. (TYPICAL AT EACH C m
<br /> - -- _-�' PIPING SUMP) SEE DETAIL ON DRAWING M-586. �� U
<br /> INSTALL TWO (2) INSPECTION WELLS AS SHOWN ON
<br /> DRAWING M-588,
<br /> -- -
<br /> --- - - --- SHEET T FOR
<br /> 20
<br /> REFER TO SUPPLEMENTAL GENERAL CONDITIONS -2
<br /> -------------___..__,_ -- _ ADDITIONAL INFORMATION AND SPECIFICATIONS.
<br /> -----�_.____- = T----- - - _.--_-
<br /> °
<br /> --- •--•
<br /> _
<br /> W
<br /> % CWDm Z
<br /> COW.) Y[Mi TW >
<br /> ]']fA➢. -�—. — .... �
<br /> f.XiFAO W .tt M BOX
<br /> cB�,u,w e[c nBaro
<br /> cvi'Aransce`eE[s IIEI wsAe nonaimo ax e� N
<br /> O
<br /> FEWet AW PIXM BPIX[0.WABiF M h�
<br /> C OEN
<br /> � I rLL
<br /> rir um vu�x LEGEND: yy� M CO
<br /> V, C ¢ CN
<br /> uexrncnwrAs
<br /> w[ewaroxa -� 2'PIPE WITH CONNECTION ` C a/ SEMIpC AVENUE p"
<br /> . NEW CONCRETE � ( 2'PIPE - NO CONNEGTION O �3N
<br /> . ( STATE HIGHWAY 120 ) I MM ® c E a=o �
<br /> - wsnu 00.Mm>O nnABB �� NEWA.C.PAIIEMENt �]— NEW ELECTRICAL CONDUIT ' - -- f -- _ - - - W J I �Y� M
<br /> ni PttoWO+o[O Br ennm • No. Date Revision
<br /> w
<br /> ,'m°'"o `•a �1 VNDERGROVND • GILL RISER
<br /> F_
<br /> PRODUCT TANK p TURBINE(PUMPI STATUS INL/DATE .7 TYPE DESIGN BY
<br /> 11..I
<br /> ITA BEFORE YOU DIG 2.7 MOD, FWH O
<br /> rrrl AA][,z 1AY.r wT n[ovw[o ro REG orR REGULAR FH FIRE HYDRANT (CLOSEST) SPANISH, DRAWN BY Z
<br /> . x. cam coxvw[.r roxm,ao,o Tux SUP or 9 SUPER UNLEADED EITHER ON PROPERTY Ofl IN CALL TOLL FREE: (800) 642-2444 B.G.E., Inc. Engr. Review ❑ (_-
<br /> nw n[X � Q � .. OWECTION OF NEATEST ONE ., ' ___ -.
<br /> nTv[[x., UNL or U UNLEADED R.H.. 2 R.R. ,t (LMJ m
<br /> TY11. ARCA STANDARDS USED: UNDERGROUND SERVICE ALERT' Permit Submittal ❑ / - - AMIPM WI T
<br /> 1.ltlreU caB¢mcx mnuwrtAr Boor STL STEEL (MINIMUM ADVANCE NOTICE OF 48 HOURS REQUIRED) 55- . 58' O
<br /> :urncrvnu Aa n[X c�croe ,
<br /> SHEET DESCRIPTION REJ DATE W MAIN WATER SHUTOFF REFERENCES Plan/Permit Approval Cl _ ��-��.� SPANISH aNEcr
<br /> NOTE: su mBruxree xoxace RECTION xo waa E MAIN ELECTRICAL PANEL ISLICANGPY
<br /> of vaaouma.[xo vePoxs E 6-19-90 G c0MqTIC OA OTHER EMERGENCY 1. TITLE 8, ARTICLE 8, 1640, (a), 1 Bid Document - -
<br /> M-586 TANK INSTALLATION DETAILS PU SFNTOFFSWITCHES, ❑_—/ 8 I4110M G. TL-1 W
<br /> M-588 SUPP. TANK INSTALLATION DETAILS E 6-19-90 o TS pgg DIVISION INDUSTRIAL2. RUL71 SAFETY, CONSTRUCTION SAFETY ORDERS TANKS
<br /> DISPENSER PIPING TERMINATION DETAIL P AN S09 WAOLLT� 2. RULE 7110, CONTRACTORS LICENSE LAW Construction Release ❑__/__= ofWIN
<br /> U
<br /> M•606 WASTE OIL TANK & COAXIAL DETAILS E 6-19-90
<br /> FAC. -0i6 20 �
<br />
|