My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1990
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
INSTALL_1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 4:11:10 PM
Creation date
5/6/2020 2:46:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1990
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HIGH POINT IN SYPHON SYSTEM 2"9 VENT RISERS <br /> GENERAL NOTES : <br /> NEW 3/8" O. D. �/ ~ \� �/ ^ \� �/ ~ \� �/ ~ �� SEE SITE PLAN ( I ) CONTRACTOR SHALL TAKE PRECAUTIONS TO PROTECT HOLE AND <br /> COPPER TUBING TO / \ / \ ! \ ! \ <br /> PUMP SYPHON BODY FOR LOCATION TRENCHES FROM SURFACE WATER RUNOFF UNTIL PAVING IS REPLACED . <br /> ( \ \ I I \ � I I ` \ I I <br /> ( 2 ) FILTER FABRIC ( DUPONT TYPAR OR MIRAFI 50OX) IS REQUIRED <br /> NEW TUBING I I I I WHEN EXISTING SOIL HAS A HIGH ORGANIC CONTENT IPEATI <br /> FITrNG 3/8"X 2" I ' OR COMPOSED OF SILTY OR FINE MATERIAL WHICH MAY BECOME <br /> MPT "QUICK" . FABRIC MUST EXTEND I ' ABOVE MAXIMUM HIGH WATER TABLE <br /> AND MAY BE PINNED TO SIDE OF HOLE WITH WIRE, ETC , . SEAMS <br /> NEW 2" TEE SCR 'D — -�-- - — I I I I I I I MUST BE LAPPED I ' MINIMUM. INSTALL ONLY WHEN DIRECTED BY <br /> GALV. C . STL - 1 1 I I I I ENGINEER IN CHARGE OF PROJECT . <br /> SEE DWG M-479 REGULAR I ( UNLEADED I I UNLEADED I I UNLEADED 1 ( 3 ) TANK MUST BE BALLASTED BY FILLING WITH LIQUID UNTIL r <br /> FOR TYPICAL GASOLINE I I GASOLINE I GASOLINE I I GASOLINE I BACKFILL IS COMPLETE, CAUTION DO NOT FILL FIBERGLASS TANK WITH > ° 'N O <br /> REMOVE EXISTING 2" PIPE DISPENSER I I I I I I LIQUID UNTIL BACKFILL IS EVEN W/TOP , SEE SPECIFICATIONS . = a C ( r <br /> CAP 8 INSTALL UNION 8 OTHER LAYOUT I I I I �' <br /> FITTINGS AS SHOWN TO CONNECT I I I I I I •� <br /> TO EXISTING 4"X Z" DOUBLE I U ++ <br /> INACTIVL� NOTE : STEEL PIPE 8 FITTINGS d i <br /> TAPPED BUSHING ( 2" SYPHON ACTIVE I 1 �" IMPACT VALVE W/UNION TOP TO HAVE MIN. 20 MIL WRAP n. -- GI G <br /> I 2" SYPHON I 2" BRANCHES ( SHEAR SECTION MUST BE FLUSHED W1 100% OVERLAP ON TO m <br /> — 7 I 1 1 ( 7yp ) , <br /> i I I I W/ TOP OF PUMP ISLAND ) FIBERGLASS PIPE FITTINGS n •-• <br /> I i I ) I 1�" PRODUCT ^�I'� c 0 <br /> RISER TO DISPENSER 0 •.2 C (n O <br /> I\ r I N N 1 N a I I I SET* DISPENSER w W ++ <br /> L _ — L . — � 1 , — ._L . . — — 2" X I " GALV . RED ELL <br /> _ - RISERPOR TTO DISPENSER RY PIPING TERMINATION ¢ p� 4) Q <br /> TURBINE END OF SYPHON SYSTEM orEsF��T�°IBQX' ,p4 a � � V <br /> -- 2" FIBERGLASS TO VAPOR a' IMPACT VALVE <br /> 2" FIBERGLASS RECOVERY HEADER ��. STABILIZER ASSEMBLY V w .� W <br /> — REMOVE EXISTING 2" PIPE 3" FIBERGLASS 2" SYPHON LINES TO SLOPE UP VENT LINES ado QEa .n } 10 <br /> CAP 8 INSTALL UNION 8 OTHER VAPOR RECOVERY LINE FROM REGULAR TO SUPER-UNLEADED TANKS cq i SECONDARY CONTAINMENT 21 O W 0 <br /> FITTINGS AS SHOWN TO CONNECT ( INSTALL AT I -INCH PER FOOT GRADE ) �' FLEX SECTION / <br /> TO EXISTING NG 2" DOUBLE 2" FIBERGLASS 2" F.G. PIPE 0) <br /> NEW 2" UNION SCR ' D TAPPED BUSHING PRODUCT LINES 11 -' FLEX CONNECTOR 8 4 - .— C <br /> GALV C . STL <br /> EXIST. 3" UNISEAL 2" F.G . 90°ELL . �` W/SWIVEL END �+ � Q <br /> NEW 2" NIPPLE TOTAL CONTAIN IREF ) (OR TEE AS REO' D) \ <br /> GALV C . STL � <br /> 2" FNOTCOUPLING JN <br /> EXIST . F .G. TYPICAL PIPING ARRANGEMENT SECONDARY Wit"XI �„ REO COUPLING 0G <br /> NEW 2” 90° ELL PIPE IREF ) CONTAINMENT FOR PIPING <br /> GALV M. I . _ NO SCALE / 1 <br /> NEW 2" NIPPLE _ _ <br /> PIPING AT PUMP ISLAND � "� O <br /> GALV C . STL EXIST 2" EXIST . 2" F .G. CONDUIT RUN FOR �� ~ �\ 2� ^ ~ �\ �� � �� x� ^ ~ �� L• <br /> BELL X MNPT PIPE ( REF ) FUTURE LEVEL GAUGES / A \ / A \ / A \ / A 1 NO SCALE <br /> EXIST . HEX BUSHING F . G. ADAPTOR TO WIRE GUTTER UNDER N <br /> 4"X 2" DBL TAP PANEL I I I I I I I I <br /> C. Sri- IREF ) REMOVE -EXIST . F.G. TANK I I I I I I I K <br /> 2" PLUG RISER ( REF ) I 0 <br /> TURBINE RELAYS MONITOR I Btl8 1 B1,8, 1 8/ I B/ I fti m <br /> CONTROLI \ I I 1 I ! \ I \ 1 2 ' MIN ABOVE ROOF OR NEAREST — EXTEND BEYOND GUTTER OR <br /> ® I I I I I I I ` � I ADJACENT STRUCTURE 'WITHIN 10' OVERHANG WHEN EXISTING <br /> I I I I t I 1 I <br /> WIPE TPOUGH I I I I I I I I La• <br /> I I I I I I I I 450 ELL Z <br /> CH-EYS I I I I ( 11 1 4 VENT RISERS REQUIRED 2"X2"XI /4" W/ ( 4 ) U-BOLTS 0 <br /> 3/4"C " I CABLE LL" <br /> I "C . 3 CABLES I CKI6a0 2s 1—L---- I_I _ BCH-GOAT 26 <br /> SYPHON HOOK -UP DETAILS ( FUTURE CONNECTION ) I , , f, , , , _ t`LCONDULET(OR EQUAL > 2" GALV. RISER U <br /> I B/ I I B/ I I. d/' I I B/ I CH-GOAT 26 <br /> NO SCALE j I I ( I CONOULETIOR EQUAL ) •� I <br /> 1 1 I l 1 i \ l� ) 3" PIPE X B ' LONG 0 <br /> 2" GALV. SWING JOINT W <br /> / \ 3/4"C . I CABLE <br /> NEW STEEL OR FIBERGLASS TANK CH-EYS / X - �/ I 2" F.G. BELL x MALE ADAPTER a " <br /> A-MONITOR IN ANNULAR SPACE Z <br /> 2" F.G. VENT LINE z <br /> CONCRETE "DEADMAN" I ' -8" WIDE � FROM TANK <br /> / X I ' -0" THICK EACH SIDE WHEN B-MONITOR IN BOTH SUMPS 2� � <br /> / \ MORE THAN ONE TANK IS INSTALLED - 18" DIA . CONCRETE BASE (BOTH SIDES <br /> THE DEADMAN BETWEEN SHALL BE 3' -4" 18 8 MONITOR FOR EACH TANK ARE MPRIFOLDED TOGETHER o / S -OTHER SIDE NOT SHOWN FOR CLARITY / U. <br /> - WIDE 8 THE TANKS MUST BE AT LEAST TANK IS CONTINUED ( THROUGH THE CONOULET AT THE TANK IN CONDULET AT THAT TANK AND THE PRIMARY CABLE FOR EACH l o p fpp N 0 <br /> Fq F <br /> 4 ' -4" APART • CLOSEST TO THE BUILDING) TO THE MONITOR CONTROL IN THE BUILDING. "_' N <br /> FIBERGLASS HOLD-DOWN STRAPS EACH TURBINE RELAY IS TO BE WIRED INTO THE MONITOR CONTROL �. Q <br /> FURNISHED BY TANK MFR. SO THAT AN ACTIVATION OF SUMP MONITOR WILL SHUT DOWN THE NOTEINE FOP THAT <br /> AN <br /> LOCATIONS . 14 REQUIRED) SEEBMANUFACTURERS TWIRING DIAGRAM FOR SPECIFIC WIRING DETAILS . GaPpf � W <br /> USE 3" PIPE IN CONCRETE BASE p <br /> 3/4" 'WIRE ROPE Wi <br /> TO SUPPORT FREE STANDING VENT <br /> TRIPLE V CLAMP RISERS ONLY . z <br /> COVER ENTIRELY W/ 1 ' -6" MIN ") <br /> LIBERAL COAT OF TANK MONITORING TOR I NG CONDU I T SCHEMATIC <br /> C ° <br /> 8i `t <br /> ASPHALT CEMENT F V <br /> ( WHEN DEADMAN NO SCALE Q <br /> x4 R00 "HUlIRPIN" IS PRECAST our <br /> ONE FOR EA. STRAP OF THE HOLE ADpVENT RISER DETAIL J Z <br /> - - - - - ONE «Ρ3 REBAR IN „_j <br /> \� /! FULL LENGTH EBAR W c2"cCOVERi41 ( OPENINGS IN SLAB TO HAVE I �" CROWN ) NO SCALE <br /> W <br /> N z <br /> INSPECTION WELL 6" BASE OR SURFACE COMPACTED SAND OR ri <br /> T MATERIAL WHERE PEAGRAVEL BACKFILL X <br /> T REO 'D BY FIELD Z N <br /> ANNULUS MONITOR ENGINEER TOP OF PAVING < 0 <br /> ANCHOR 8 CONNECTION FILL 9 VAPOR RECOVER -1I <br /> NO SCALE j (PHASE 1 ) S Q <br /> FILTER FABRIC Li 4" M[N \ 0 g W <br /> SEE NOTE NO. 2 <br /> IN UNSTABLE SOIL THE DIMENSION a <br /> MUST BE 4 FT FROM BOTH SIDES a s z O <br /> AND ENDS iWITH FIBERGLASS TANKS ) N 7 4 <br /> VAPOR RECOVERY LINE <br /> CONTROL <br /> In <br /> F M <br /> EXPANSION 3 PRODUCT PIPING LINES V) <br /> JOINTS TO BE <br /> TOOLED"WITH VENT/VAPOR RECOVERY 12" <br /> MIN 3/8"RAD]US (PHASE II ) TYP OPP( • Z <br /> T r 611X 611-4/4 WWM <br /> -� <br /> (OR «3 I6" o.c ) TYPICAL PIPING TRENCH DETAIL M . F . MURPHEY <br /> 6 6" 6" 3 ' -4']�.j I -8 -mgmNO SCALE T m• <br /> type data W <br /> NOTE : (L BETWEEN FILLS 5/25/90 <br /> • REQUIRED IN 'w'iT ' :)L"E ONLY , a3 REBAR CAGE TOP 81 <br /> DATE REVISIONS <br /> • TO BE INSTALL•:) C L'r WHEN CALLED FOR ON INSPECTION WELL BOTTOM 2" COVER TYP . drown <br /> SUPPLEMENTAL C ;ND :TI _'NS OR BY CWNER ' S ENGINEER . ALL AROUND PENETRATIONS A 82989 DETAILS. 4 TANKS, GROUNDING 8 SYPHON <br /> B VI/89 SYPHON, MONITORING , VENT DETAILS Pfel • <br /> TYPICAL iK ANCHORING SLAB REINFORCING C 10/1849 GENERAL REVISIONS - CLARIFIED SYPHON LINE REQUIREMENTS N <br /> NO SCALE- PX3 SCALE <br /> D 525/90 REVISE SLOPE OF SYPHON LINE . CHANGE TANK SEQUENCE M- 588 <br /> 6/19N0 ADDEO TOOLED EXPANSION JOINT rev , Fi of <br /> i s <br /> 2,1824sA00S OETATI.S M5880 0002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.