Laserfiche WebLink
SCHEMATIC PRODUCT PIPING PLAN GENERAL NOTES <br /> ALL TANK AND SCALE: 111 10' _ ------ ----- ` ® o. <br /> SCALE, 1" . 10 DRAWINGS M-586L1 LINE <br /> AND M 606, SHALL BE PERFORMED AS SHOWN ON <br /> OINSTALL FOUR (4) 10, 000 GALLON FIBERGLASS DOUBLE-WALL 0 <br /> STEEL TANKS WITH A.P.I. RONAN LEAK ALARM SYSTEM. TANKS TO BEC a N n Z <br /> SET 48" MINIM BELOW FINISH GRADE. D ,c <br /> C <br /> TANKS ARE 8' NOMINAL DIAMETER AND SHALL BE INSTALLED M pEp a C Lo <br /> APPROXIMATELY 2'-0" APART, SEE DRAWING M-586. W 0 <br /> a O 4) C <br /> TANK ELEVATION: TO CALCULATE TOP OF TANK ELEVATION; �rEE • C O <br /> START WITH MINIMUM DEPTH OF VAPOR-RECOVERY LINE AT THE r = ,� > 0 <br /> i FARTHEST DISPENSER AND SLOP 1/411 PER FOOT AND ADD 12" AT THE 0 C w 0 <br /> TANK. ADD 1311 (FOR 311 PIPE) OR 811 (FOR 211 PIPE) FOR A CHANGE / \ H W � o) I... <br /> IN PIPING DIRECTION OTHER THAN 90° OR 45" . SST TANKS SLIGHTLY V e GO 0) V <br /> �f 9 DEEPER THAN CALCULATION AS INSURANCE AND 4 FEET BELOW MINIMUM a C C1 Q W <br /> _-. GRADE. < 3 7 <br /> � u 01 <br /> _ ---- ___ - -- --- --- O2 INSTALL REINFORCED CONCRETE TANK SLAB. SET MANHOLE COVERS • U) {A U <br /> I f 1-1/211 ABOVE SLAB. (SLAB CROWN 1 FOOT MINIMUM CONCENTRIC. ) <br /> 1 N {n �. <br /> ;. -- - SEE DETAILS ON DRAWING M-588. _ a 0d' <br /> `-- O INSTALL FOUR INCH (4") FILL RISERS ON EACH TANK WITH OVERFILL � <br /> L -T7 <br /> PREVENTION ON DROP TUBE AND MINIMUM FIVE (5) GALLON SPILL O C <br /> CONTAINMENT BOXES (MANHOLE COVERS TO BE WATERTIGHT) . RISERS ` <br /> MUST BE OROUNDEDI SEE DETAIL ON DRAWING M-586. OI N <br /> _ I C O <br /> INSTALL RISER FOR PHASE II VAPOR RECOVERY AND VENT CONNECTIONS +r J <br /> WITH EXTRACTOR TEE AND BALL FLOATS. SEE DETAIL ON DRAWING M- O C) <br /> 586. ( ' ` P% <br /> - - I O5 INSTALL THREE (3) 1-1/2 HORSEPOWER SUBMERSIBLE PUMPS WITH RED N i-� -_. `1 JACKET LEAK DETECTOR (MANHOLE COVERS TO BE WATERTIGHT) . . <br /> mil X <br /> INSTALL 211 PRODUCT LINES WITHIN 311 SECONDARY CONTAINMENT 10 O <br /> PIPING (A.D. SMITH RED THREAD II, AMERON OR TOTAL m <br /> -- 1 --- - --� _ CONTAINMENT) . SLOPE 1/41' PER FOOT BACK TO TANKS. SEE DETAIL <br /> ON DRAWING M-508. Q <br /> INSTALL 311 MANIFOLDED VAPOR RECOVERY LINES, SLOPE 1/4" PER D" <br /> _ FOOT FROM REGULAR TANK, AND INSTALL 211 DIAMETER VAPOR RECOVERY <br /> MANIFOLD, SLOPING 1/411 PER FOOT FROM REMAINING TANKS TO THE <br /> - _\ <br /> REGULAR TANK. REFER TO SCHEMATIC DIAGRAM ON DRAWING M-606. <br /> INSTALL A.P.I . RONAN TANK/PIPING MONITOR SYSTEM WITH LEAK N <br /> - - - '\ MONI'YOR CONTROL BOX IN OFFICE (EXACT LOCATION TO BE DETERMINED Z <br /> O IN FIELD) . <br /> OINSTALL FOUR (4) 2" SINGLE VENT LINES (ONE FOR EACH TANK) , Jw <br /> Op I SLOPING 1/411 PER FOOT BACK TO TANKS. REFER TO SCHEMATIC <br /> O DIAGRAM ON DRAWING M-606. INSTALL 211 DIAMETER GALVAN17ED VENT <br /> RISERS (ONE FOR EACH TANK) TO EXTEND A MINIMUM OF 2411 ABOVE (ry <br /> 19 , ADJACENT STRUCTURE. SEE DETAIL ON DRAWING M-588 . _ ,a <br /> C�4 0 <br /> 10 INSTALL CONDUITS AND CONDUCTORS AND/OR PULL ROPES FOR PUMPS, a W Qz <br /> MONITORING EQUIPMENT, FUTURE MONITORING EQUIPMENT, AND v I- <br /> DISPENSERS AS SHOWN ON SCHEMATIC DIAGRAM ON DRAWING M-588 . Q Z <br /> a <br /> � P�6 ALL CONDUITS LEAVING CLASS I HAZARDOUS AREAS SHALL BE SEALED F � V' <br /> 1 PER N.E.C. AND LOCAL REQUIREMENTS. U ) _j <br /> _ <br /> Now ' I UU—R$ U8—RU 8R—UUI .1 'k ' � � <br /> 14 TYP. - _ 13 TYP. A�14 1 19 11 INSTALL ANNULAR - SPACE MONITOR (MANHOLE COVERS 'TO DE U <br /> o }O WATERTIGHT) . SEE DETAIL ON DRAWING M-586. y J <br /> c Ir U I 12 INSTALL 311 X 411 VAPOR CHECK VALVE AND CAP ON 411 PHASE I RISER. Q Q <br /> SEE DETAIL ON DRAWING M-586, MUST BE GROUNDED! <br /> 0 W V U <br /> W <br /> 13 INSTALL PUMP RELAYS. EXACT LOCATION TO BE DETERMINED IN 09 Q d F <br /> FIELD. a W V Z <br /> W a <br /> INSTALL UNDER-DISPENSER CONTAINMENT SEE "BRAVO BOX" , + F: � <br /> TERMINATION DETAIL ON THIS SHEET) . SHEAR VALVE ANCHOR BOX v <br /> S 1 TYP. I I y p AND DISPENSER CONTROL EQUIPMENT (PER DETAIL ON DRAWING M-588) . ` W 4 U. <br /> ® 15 PLACE AN ACTIVE SIPHON LINE, 211 FIBERGLASS WITHIN 3" DIAMETER Q (n '•� 0 <br /> 0 8 s SECONDARY CONTAINMENT PIPING BETWEEN THE UNLEADED TANKS. 5 O <br /> - I a SLOPE 1/411 PER FOOT FROM THE NON-TUR13INED TANK TO THE TURBINED <br /> TANK. REFER TO SCHEMATIC DIAGRAMS ON DRAWING M-588 . W F <br /> 4 <br /> 7 8 ill �c7 v� > a 16 PLACE INACTIVE SIPHON LINES, 211 FIBERGLASS WITHIN 3'1 DIAMETER / � Z <br /> ! I F SECONDARY CONTAINMENT WITH TERMINATION END CAP FITTINGS (SEE V 2 <br /> H O a DRAWING M-586) . BETWEEN THE SUPER UNLEADED TANK AND THE " F W <br /> �( 1 . I O a 'Sf, ADJACENT UNLEADED TANK AND BETWEEN THE REGULAR TANK AND THE J Q r <br /> ADJACENT UNLEADED TANK. ALL SIPHONS TO SLOPE 11411 PER FOOT <br /> TOWARD THE REGULAR TANK. REFER TO SCHEMATICS ON DRAWING M-25 588 , <br /> F a <br /> Now UU—RS1.211- -111F $R—UUI a �4 17 PROVIDE A STATIC GROUNDING SYSTEM. AS SHOWN ON DETAIL ON • V <br /> DRAWING M-606, V Z <br /> ----._ o <br /> ISI -- - - - - - I' 18 INSTALL PIPING LEAK MONITOR AT LOW POINT. (TYPICAL AT EACH + m <br /> PIPING SUMP) SEE DETAIL ON DRAWING M-586. �t yO <br /> \\^\ 19 INSTALL TWO (2) INSPECTION WELLS AS SHOWN ON i a u e <br /> "= DRAWING M-588. A• V1 .W <br /> V <br /> - ---'- - O SHEET T FOR <br /> _ 20 REFER TO SUPPLEMENTAL GENERAL CONDITIONS, 2, a C ° �a=_ <br /> 1 C4 <br /> ADDITIONAL INFORMATION <br /> --- AND SPECIFICATIONS <br /> YAC v a "' <br /> a . <br /> W o <br /> C z <br /> 01 ecrt'!,o+uew,r faraPDov <br /> g xuvLruw efL APoun <br /> SXGP VALVE $jIN <br /> ,Ny( <br /> fRWW:I fl:CS > Ff.,,Sts40 UR SAVTVf `� <br /> GE0.mL-- Glz'IFUB'.G Wr% •� <br /> !p ig1P 3ACx COKPE+E - e•OI <br /> nBUVE iSuvG <br /> _-111 III �uu1u,Aeee�.izouoau�sv � C <br /> C .t eN� <br /> IL <br /> LEGEND: C3CC <br /> : e,10.,I 2' PPE WITH CONNECTION CL NY CCP � T l F V ` <br /> p00 <br /> Ir <br /> ( STATE HIGHWAY 120 ) NENCONCRETE —� z•PPE No CONNECTION0 O C E Fe$ U)— zuu P,LxXEAo rm..w5 NEW A.C.PAVEMENT —r— NEW ELECTRICAL CONDUIT U) <br /> 5 Pf(CNUEtFED B+'MAVa .-- —J •-/ <br /> No. Date Revisionielon Witt <br /> UNDERGROUND • FILL RISER <br /> PRODUCT TANK p TUREINE IPUMPI STATUS INUDATE BLpO.TYPE DESIGN BY <br /> BEFORE YOU DIG 2.7 MOD, FWH O <br /> REO or R REGULAR SPANISH, <br /> FH FIRE HYDRANT!CLOSEST) DRAWN 9Y Z <br /> ,cacao of% - . SUP or S SUPER UNLEADED EITHER ON PROPERTY OR IN CALL TOLL FREE: (800) 642-2444 B.G.E., Inc. Engr. Review ❑ /—_ — „ <br /> f�'iies aP - DIRECTION <br /> UNL o, U UNLEADED OF NEAREST ONE -- R.H„ 2 R.R. ff• IL.M.) <br /> "UNDERGROUND SERVICE ALERT" _ T WxfD <br /> &aaE+ ARCO STANDARDS USED: Permit Submittal <br /> Eo>a-,oP<u,fA:wE.r xom STL STEEL (MINIMUM ADVANCE NOTICE OF 43 HOURS REQUIRED) —/ 55' - 581 Q <br /> 4sfN unNUFAf[UAFN n9 ALE%f4`n2[IM R 11) <br /> SHEET DESCRIPTION REV p_ATts W MAIN waieR SHUTOFF REFERENCES Plan/Permit Approval 0— If - - SPANISH saver <br /> NOTE: sic sre mAx,oP x,;Nuu SECTION caste. E MAW ELECTRICAL PANEL ISLICANOPY �1 �� <br /> oI It <br /> roll Pxo rums M-58G TANK INSTALLATION DETAILS E G-19-90 0 � C MATIC OR OTHER MERGENCY 1. TITLE 8, ARTICLE 6, 1540, (a), 1 Bid Document - - L <br /> PU SHUroFF sxtTEN S. ❑—I 8 (4)IOM G, <br /> M-58S SUPP. TANK INSTALLATION DETAILS E 6-19-90 nsa�Ffs couNTER DIVISION INDUSTRIAL SAFETY, CONSTRUCTION SAFETY ORDERS TANKS •1 <br /> DISPENSER PIPING TERMINATION DETAIL M-606 WASTE OIL TANK 8 COAXIAL DETAILS E 6-i9-90 ON INSIDE MILL 2. RULE 7110, CONTRACTORS LICENSE LAW ConatrucUon Release ❑_/_ - - OF� V <br /> FAC. #6020 � <br /> � I <br />