My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 4:58:34 PM
Creation date
5/6/2020 2:47:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
zz <br /> Flexible Entry Boots % s ..FleitttileEi>try;B49tSPfications` . ...:',.: <br /> Environ offers a complete line of environmentally safe Parl No. Type Use Nominal Sim Boot to Hole Saw Stu <br /> sump entry seals in sizes to seal standard electrical :�µ; ]n• 84: 23/8' <br /> FFB30fi0 5tt+dded ' 'fS��?d!!n,_ r•..r-.:->'• . <br /> conduit,rigid pipe and flexible pipe. Environ offers +,•.�. -•�` Ring <br /> Flexible Entry Boots 1n both 'Studded Ring' and FEB-3075 Studded Ring <br /> Conduit 3/4' 1.05' 2-3/8' <br /> ,compression Ring'configurations. Both of these type EE>3` b <br /> YXS` (0"` !'9� a' ' c rV: y 1:05' 4-1/4' <br /> entry boots are made of materials suitable for - -= - 1. 132" 2 3/8' <br /> underground burial and exposure to fuels. FE"100 Studded Ring Conduit <br /> 4-1/4' <br /> FEB-0150 Expansion Ring Pipe 1-1/2' 1.81- 4.1/4' <br /> FE8T2b^0 t ! � .p - r , S15.- :� 1> ?37• 4-1/4' <br /> FEB-0200 Expansion Ring Pipe 2' 2.37' <br /> +' =^"� $y.:.•S 350. 4-1/4' <br /> FEB-0300 iKf$Expansion Ring Pipe 3- 3.50' 5-1/2' <br /> 390 <br /> 5-1/2' <br /> . tt. <br /> FEB-7400 Studded Ring Pipe 4' 4.50' 5.1/2' <br /> FEggtipp; .filrigf,`r? !Pe- 'C r� -'*:/6 S0' Use Sabre Saw <br /> -a: <br /> Studded Ring Flexible Entry Boots Expansion Ring Flexible Entry Boots <br /> This style of Flexible Entry Boot mounts to a sump wall by means of stainless This style of Flexible Entry Boo(mounts to a sump wall by means of a nylon <br /> steel studs,a compression ring and nut fasteners and seals to the pipe or expansion ring and to the pipe or conduit using a band damp. To install this <br /> conduit by using a band damp. To install this type of boot,it is necessary to type of boot it is only necessary to drill the boot opening using the <br /> first drill a series of smaller stud holes around the opening using a templet appropriate size hole saw. The smaller stud holes are not required. This <br /> and then the boot opening using the appropriate size hole saw. Detailed boot uses an internal expansion ring to create the pressure seal. (detailed <br /> installation instructions are packaged with the boots. <br /> installation instnictions are packaged with the boots. Available soon. <br /> 1 r :.^ter-].•�,�.. <br /> ®r - <br /> Entry Boot Flexibility Angled Entries Round Surface Installations <br /> AN entry boots are designed to provide universal Flexible Entry Boots are designed to permit up to Flexible Entry Boots may be installed on round <br /> flexibility for the pipe or conduit providing up and a 30' angle of flexibility for pipe and conduit surfaces which have a radius diameter greater <br /> down, side to side,back to front movement as entries. Angles greater than 30•could prevent than 30' (750mm). The installation procedures <br /> well as angled pipe entries. This flexibility is the boot from sealing around the pipe or conduit. are the same as described above except that the <br /> important for aligning pipe connections or as a It angled entries are required• make sure the bolt holes should be made slightly larger after <br /> stress relief for the pipe during backfilling and boot opening in the wall has a sanded edge so initiashoulld be ng. Oonl 'Studund ded <br /> Ring" entry boots <br /> ground movement. as not to damage the entry boot. <br />
The URL can be used to link to this page
Your browser does not support the video tag.