Laserfiche WebLink
CLEARWATEK <br /> fn4rQn sin l.7 Sarv,cra <br /> on 12122/97 this drum was transported off-site by Starbuck Construction, Inc (SCI), The attached <br /> letter from SCI documents the removal of flus drum. The drum will be temporarily stored in a <br /> permutted treatment,storage and disposal(TSD) facility where it will be bulked with similar wastes and <br /> hawed to the end disposal facility. We anticipate this to occur within the next two weeks and final <br /> facility disposal documentation will be forwarded to us upon completion Please let fae now if you <br /> will need a copy£orwazded to you. <br /> Typically well abandonment is the final stage of site work required ,prior to processing final closure <br /> documentation During your visit to the site,you indicated that you would try to expedite the closure <br /> documentation so that our client,Boettcche r-Western, has it by the end of the year, We appreciate <br /> your promptness and attention to this issue. if you have any questions or comments regarding this <br /> please do not Hesitate to call us at(510) 893-5160 <br /> • <br /> Sincerely, <br /> CLEARWATER GROUP,INC <br /> jr gn No 6505 Z � <br /> .y. <br /> Heidi M baucr 3riaai Gwxitzi, It <br /> Project Geologist Senior Geologist <br /> • cc ]felly StradbSer <br /> ET/E d dnodg N31UM U3-0 Wd85 2T L6, 62 33a <br />