Laserfiche WebLink
CLEARWATER <br /> £nvironm rnlal Srrv�crs <br /> QUARTERLY GROUNDWATER MONITORING REPORT <br /> FIRST QUARTER 1997 <br /> Boettcher Western Properties <br /> 4555 North Pershing Avenue, Stockton, California <br /> March 27, 1997 <br /> BACKGROUND <br /> The site is currently unoccupied and is used primarily as a two-lane driveway providing access to an <br /> adjacent shopping center The site was formerly operated as a card lock refueling station Nine soil <br /> borings were drilled in June 1991 Analysis of soil samples collected from the borings indicated the <br /> presence of gasoline contamination at a depth of approximately 25 feet bgs Three underground storage <br /> tanks (UST's) containing leaded gasoline, unleaded gasoline, and diesel fuel were excavated and <br /> removed from the site by TreaTek, Inc on January 8, 1992 In November 1992, McLaren/Hart installed <br /> five groundwater monitoring wells (MW-1 through MW-5) to a maximum depth of 40 feet bgs <br /> Clearwater began quarterly groundwater monitoring and sampling at the site in December 1994 <br /> GROUNDWATER MONITORING FIELD ACTIVITIES <br /> Date of field activities March 6, 1997 <br /> Wells monitored/sampled MW-1, MW-2, MW-3, MWA, and MW-5 <br /> Analytes tested TPHg, BTEX, and MTBE <br /> Analytical methods EPA Methods 8015/8020 (modified) <br /> . <br /> Laboratory American Environmental Network, Inc of Pleasant Hill, CA <br /> GROUNDWATER MONITORING RESULTS <br /> Depth to water 16 31 to 16 88 feet below grade <br /> Flow directon/gradient East northeast at 0 6% (0 006 ft/ft) <br /> TPHg concentration range 60 ppb (MW-1) to 90 ppb (MW-5), <50 ppb in all other wells <br /> Benzene concentration range 13 ppb (MW-2) to 9 4 ppb (MW-3), <0 5 ppb in all other wells <br /> MTBE concentration range <5 0 ppb in all wells <br /> Remarks The direction of groundwater flow is generally consistent with previous measurements, <br /> depth to groundwater is approximately four feet higher than on December 17, 1996 <br /> PROJECT STATUS <br /> Quarterly groundwater monitoring will be continued <br /> ATTACHMENTS <br /> • Site Location Map (Figure 1) <br /> • Site Plan (Figure 2) <br /> • Groundwater Elevation Contour Map-3/6/97(Figure 3) <br /> • Hydrocarbon Distribution Map-3/6/97(Figure 4) <br /> • Groundwater Elevations and Analytical Results (Table 1) <br /> • Clearwater Gauge/Purge Calculations and Well Purging Data (Appendix A) <br /> • Laboratory Report and Chain-of-Custody Form (Appendix B) <br /> • Clearwater Groundwater Monitoring and Sampling Protocols (Appendix C) <br />