Laserfiche WebLink
I WELL DEVELOPMENT DATA SHEET <br /> RUA PaL'rF (rill out campiately) <br /> WELL OR LOCATION <br /> PROJECT NEL-k- . t- SSQr7 . SAMPLER C ._..., I DATE " l-2- 2 <br /> Action mm PUMR rite lower Id) <br /> Well type M LA-� Start pump Begin yr 1 <br /> (MW,EW,eta) 1 n`_ <br /> Ld diameter-' ,3 <br /> SVVL 2-Cequals�,l b gaUft.casing <br /> (d above screen) <br /> Stop 222. <br />' packer 39 ft Sanded <br /> bailer depth ( °'�) (Fns) 1WL) <br /> L ] TOP Purge calculation <br /> SWL 3C. 7 i� gaidt ' ►4 ft. gals x 10 gals. <br /> (if in screen) I ' SWL to BOP or -one purge volume- <br />' 4 4opacker to BOP volume 10 casings <br /> SOP Head ja=e calculatfon (Airlift on1Y <br /> measured g `�tL gals- <br />' T D. � 0 T.D (as built) <br /> pra&*rto SWL <br /> Actual gallons purged a-7 Equipment Used/Sampling Method/ Descnpbon of Event/Comnwrd <br /> �Ni r• c'�,em 26D PPS-+ (3w.) HAX) 54•V-4rEb �Ld- -3'»ao.JMRAm• , <br /> Actual volumes purged 1 -7 =d-lrb. <br /> PLAVao ' Z"S'.A:tirek:K+.94W. "-AATg.z i3sf i= rc` t e-ae'Ar- Ar 2ND L'= <br /> LLrt-TAZF0 .2a010J-Y A�=itFe -•e.�tULSL. <br /> (sell yield <br /> below) +0 ir 1$.-A L Zo• i, <br /> Gallons purged TEMP C le"F EC Ph TURBIDITY <br />' (circle one (,us/cm) (NTU) <br /> y. 4& Cci � i -A. tZ3 x , 75 * <br /> 2. 411f 1070 7 ?_kxrt <br /> S <br /> 5. r eca-�I. 4 2740 C" , P 7Q,0 <br /> 6. Cot3- 9 7v Co, k,(-, 47.0 <br /> S• 1 Z, Cm a !vC fo,�'U Z7,O <br /> 9. <br /> Ia �, ,� `r �G�o �?9 1 ►5� <br /> ty. 17,C., `��v v �, ?Q 3 no <br /> Take measurement at HY-Minimal MY-WL drop-able to purge 3 LY-Able to purge 3 VLY-Minimal recharge- <br /> approzimately each W L drop volumes dunng one sitting volumes by returning unable to purge <br /> casing volume purged by Huang pump rate or later or next day. 3 volume& <br />' ..... 2rding Durno <br />