My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
5608
>
3500 - Local Oversight Program
>
PR0545653
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 4:37:21 PM
Creation date
5/6/2020 3:55:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545653
PE
3528
FACILITY_ID
FA0003727
FACILITY_NAME
CHEVRON STATION #96465 (INACT)
STREET_NUMBER
5608
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10815011
CURRENT_STATUS
02
SITE_LOCATION
5608 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t I 11-1 <br /> 1005188 09,28 1&2095951 `./ 007 <br /> x <br /> Wa;,t e <br /> Battered vent well <br /> I <br /> RELEAF VALVE-- <br /> VAPOR <br /> ALVE VAPOR TRAP ---__ TAN K <br /> VARIABLE SPEED EXCAVATIO <br /> BLOWER <br /> & MOTOR <br /> RELEAF VALVE------ { <br /> Y—STRAINER 4" PERFORATED <br /> EXISTING SCHEDUAL 44 <br /> BUILDING PV.C. PIPE <br /> PIPE RISER` I € i <br /> with inlet valve I _ <br /> at surface I II i <br /> 4" vent line' <br /> 0= ==�_ 1�— r =0 2" Battered vent wells <br /> XISTING — BLOWER and MOTOR <br /> 8jUILDING GROUND LEVEL <br /> a}' SOLID, <br /> SCHEDULE 40 !?V.C. RISERSti <br /> "r TANK EXCAVATION , <br /> 4" PERFORATED X. <br /> SCHEDULE 40 P,V.C. PIPE <br /> SECTION /T\ <br /> NOTE <br /> PLACE 4" VENT LINE ON GEOTEXTILE FABRIC <br /> LINING EXCAVATION WITH A MINIMUM OF 6" OF <br /> PEA GRAVEL ABOVE AND BELOW PIPE. <br /> VENT LINES WITH-IN THE TANK EXCAVATION SHALL BE <br /> PLACED BETWEEN THE TANKS AND THE EDGE OF <br /> THE EXCAVATION. <br /> Construct 2" battered vent wells @ appror.itnately 7" spacing Dames & Moore <br /> with annulus filled with #3 sand PLATE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.