Laserfiche WebLink
w DATE: J �.•. �0 <br /> SERVICE STATION <br /> LOCATION: <br /> CONTRACT f: <br /> RELEARE#: <br /> CONTRACTOR: <br /> HYDROGEOLOGIC WORK RELEASE <br /> SOIL BORINGS/MONITORING WELLS <br /> Specification Work <br /> Reference Requested <br /> [ I <br /> Field <br /> 2.1 [ j Install soil boring(s) and collect soil samples every S feet for <br /> Iithologic description and possible chemical analysis. The total depth <br /> of the boring(s) should be <br /> 2.1/2.2 [ ] If ground water is encountered during drilling convert the boring(s) <br /> to inch monitoring wells using schedule 40 PVC after <br /> confering with Chevron engineer. <br /> 2.2l Install 0 ground water monitoring wc1l(s). The well(s) should be <br /> `_ Y " inch diameter schedule 40 PVC pipe. <br /> 2.1 [ ) Location above of [ ] soil boring(s) / [ ] monitoring wcll(s) are <br /> specified on the attached base map 01 <br /> 2.1 [ ] Contractor is to locate [ ] soil boring(s) / [ ] monitoring well(s) and <br /> confirm with Chevron prior to installation. <br /> Office <br /> 2.6 [ ] Construct a geologic cross-section of the site using boring and <br /> monitoring well information. <br /> PQM st�i° <br /> AGE <br /> R <br /> NM�N��v�G,s <br />