My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
5608
>
3500 - Local Oversight Program
>
PR0545653
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 4:37:21 PM
Creation date
5/6/2020 3:55:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545653
PE
3528
FACILITY_ID
FA0003727
FACILITY_NAME
CHEVRON STATION #96465 (INACT)
STREET_NUMBER
5608
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10815011
CURRENT_STATUS
02
SITE_LOCATION
5608 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w DATE: J �.•. �0 <br /> SERVICE STATION <br /> LOCATION: <br /> CONTRACT f: <br /> RELEARE#: <br /> CONTRACTOR: <br /> HYDROGEOLOGIC WORK RELEASE <br /> SOIL BORINGS/MONITORING WELLS <br /> Specification Work <br /> Reference Requested <br /> [ I <br /> Field <br /> 2.1 [ j Install soil boring(s) and collect soil samples every S feet for <br /> Iithologic description and possible chemical analysis. The total depth <br /> of the boring(s) should be <br /> 2.1/2.2 [ ] If ground water is encountered during drilling convert the boring(s) <br /> to inch monitoring wells using schedule 40 PVC after <br /> confering with Chevron engineer. <br /> 2.2l Install 0 ground water monitoring wc1l(s). The well(s) should be <br /> `_ Y " inch diameter schedule 40 PVC pipe. <br /> 2.1 [ ) Location above of [ ] soil boring(s) / [ ] monitoring wcll(s) are <br /> specified on the attached base map 01 <br /> 2.1 [ ] Contractor is to locate [ ] soil boring(s) / [ ] monitoring well(s) and <br /> confirm with Chevron prior to installation. <br /> Office <br /> 2.6 [ ] Construct a geologic cross-section of the site using boring and <br /> monitoring well information. <br /> PQM st�i° <br /> AGE <br /> R <br /> NM�N��v�G,s <br />
The URL can be used to link to this page
Your browser does not support the video tag.