My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012618
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
5608
>
3500 - Local Oversight Program
>
PR0545653
>
ARCHIVED REPORTS_XR0012618
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 4:48:28 PM
Creation date
5/6/2020 4:00:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012618
RECORD_ID
PR0545653
PE
3528
FACILITY_ID
FA0003727
FACILITY_NAME
CHEVRON STATION #96465 (INACT)
STREET_NUMBER
5608
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10815011
CURRENT_STATUS
02
SITE_LOCATION
5608 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
453
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r: <br /> ty <br /> M <br /> R. <br /> nM <br /> Chevron U.S.A. <br /> Page S <br /> The proposed scope of services included the following tasks: <br /> o Research and review of pertinent, readily available geologic and hydrologic <br /> literature,and previous investigations at the subject property; <br /> o Obtaining required permits prior to the commencement of the field portion of the <br /> additional investigation; <br /> ,. o Phase I drilling and sampling of subsoils for chemical analysis, at and in the <br /> vicinity of the subject property; <br /> o Installation,development and sampling of Phase I groundwatar monitoring wells at <br /> and in the vicinity of the subject property to obtain groundwater samples for <br /> chemical analysis; <br /> o Phase 11 drilling, sampling of subsoils for chemical analysis;the installation, <br /> development and sampling of groundwater monitoring wells in the vicinity of <br /> the eastern property line, including one well off of the subject property; and <br /> replacing existing monitoring wells that have gone dry; <br /> o Re-assessment of groundwater gradient and direction of flow; <br /> o Re-development, and sampling of existing groundwater monitoring wells at the <br /> subject property; <br /> o Replace well heads of exic<ting wells; <br /> o Chemical analysis of subsoil and groundwater samples to detect the presence and <br /> concentration of petroleum constituents; and <br /> M9 <br /> A <br /> i <br /> 5.0 TECHNICAL APPROACH <br /> In order to accomplish the goals established for the proposed investigation,the <br /> W work was separated into three distinct tasks including: <br /> i I. Literature survey <br /> 11. Field investigation <br /> 111. Laboratory analysis <br /> - � 16UnU�2fl6-U44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.