Laserfiche WebLink
e +iIII'.f ,14 3:y Y <br /> ,p <br /> 4 <br /> ! W1. <br /> Chevron U.S.R. - Page 1t <br /> " 6.0 PROPOSED PROJECT SCHEDUtoE <br /> Dames & Moore is prepared to begin this study upon receipt of approv41 of <br /> the proposed workplan from the local Health or Advisory agency, or 1rcal OR <br /> State Water District (RWQCB) as required. It is estimated that the proposed <br /> scope of services will require approximately eight reeks to complete. This <br /> schedule is dependent on gaining authorized access to adjacent property owned by <br /> others to drill and install monitoring wells; the time necessary for regulatory <br /> agency review; permitting; scheduling of drilling equipment; anei time t.-gnired <br /> for arrange specific chemical analysis. We will a our visit to the site for the <br /> P g <br /> field portion of the investigation through your office. <br /> -000- u P�PiI.00 ClP1cr� �s <br /> i <br /> i <br /> . i <br /> i <br /> i <br /> e <br />