Laserfiche WebLink
r <br /> UST Program: Monitoring Plar -ter UST Tank ...: CERS Regulator Page 1 of 2 <br /> California Environmental Reporting System:Regulator vicki mccartnev's Account Sin Ou Tools Reports Help <br /> Submittals Facilities Businesses Regulators Compliance Responders Reports <br /> UST Monitoring Plan: ARCO 06080 <br /> Home N Submittal Search » Submittal:12/7/2015(10181263) )) UST:UST Monitoring Plan(Accepted) <br /> Submittal Element History <br /> Submitted for CERS ID 10181263 on 12/7/2015 10:56AM by Nicole Maonerof BP West Coast Products LLC-Retail(Carson) <br /> Comments by submitter:UPLOADED NEW FINANCIAL RESPONSIBILITY AND DO STATEMENT.NO OTHER CHANGES MADE TO UST SECTION. <br /> Submittal was Acceptedon 12/9/2015 by NG,tMLLYfor San Joaquin County Environmental Health <br /> Comments by regulator.This UST submittal was received but not reviewed by Willy Ng,RENS,ICC Certified UST Inspector,on December 9,2015.This <br /> submittal is subject to verification at the next scheduled field inspection. <br /> 1% View Tank Information Return to Submittal <br /> Fr <br /> opy Monitoring Plan Informatio <br /> is section would allow the user to copy Monitoring Plan information from another tank.This option would only appear if this facility had one or more existing <br /> tanks with Monitoring Plans. <br /> Facility Informatio Equipment Testing and Preventive MaintenanceMonitoring Location <br /> ARCO 06080 Monitoring Equipment Serviced Site Plot Plan Submitted <br /> 85 E LOUISE AVE Annually New Plan Submitted <br /> LATHROP , CA 95330 <br /> Tank Monitoring Is Performed Using the Following Method(s) <br /> Yes Continuous Electronic Tank Monitoring!v <br /> Secondary Containment System Monitor Panel Manufacturer Leak Sensor Manufacturer <br /> Liquid-Filled VEEDER ROOT VEEDER ROOT <br /> Monitor Panel Model Leak Sensor Model# <br /> TLS-350 794380303 <br /> No Automatic Tank Gauging <br /> No Monthly Statistical Inventory Reconciliation 4� <br /> No Weekly Manual Tank Gauge a No Tank Integrity Testing* <br /> No cher Monitoring <br /> Pipe Monitoring is Performed Using the Following Methods <br /> Yes Continuous Monitoring of Piping Secondary Containment* <br /> Piping Secondary Containment Panel Manufacturer Leak Sensor Manufacturer <br /> Dry VEEDER ROOT VEEDER ROOT <br /> Panel Model# Leak Sensor Model <br /> TLS-350 794380-208 <br /> Leak Alarm Triggers Automatic Pump Shutdown <br /> Yes <br /> Failure/Disconnect Triggers Pump Shutdown <br /> Yes <br /> No Mechanical Line Leak Detector Performs 3 GPH Leak Test G <br /> Yes Electronic Line Leak Detector Performs 3 GPH Leak Test <br /> ELLD Manufacturer ELLD Programmed In-Line Testing ELLD Triggers Automatic Pump Shutdown <br /> VEEDER ROOT - Yes <br /> ELLD Model 0.2 GPH Minimum Monthly ELLD Failure/Disconnect Triggers Automatic Shutdown <br /> PLLD 8484) 0.1 GPH Minimum Annually Yes <br /> No Pipeline Integrity Testing No Visual Pipeline Monitoring l3 <br /> No Suction Piping Meets Exemption Criteria#n <br /> No No Regulated Piping Per Health and Safety Code,Division 20,Chapter 6.71s Connected To The Tank System V <br /> No Other Pipeline Monitoring* <br /> Under Dispenser Containment(UDC)Monitoring <br /> UDC Monitoring Detection of Leak into UDC Triggers Audible and Visual Alarms <br /> Continuous Yes <br /> UDC Leak Alarm Triggers Automatic Pump Shutdown <br /> UDC Panel Manufacturer Yes <br /> VEEDER ROOT Failure/Disconnection of UDC Monitoring System Triggers Automatic Pump Shutdown <br /> UDC Panel Model# - - � <br /> TLS-350 �'CERS Heli Mom:orkm2,j�;; o�fh9El$g8f16KBi enser <br /> https:Hcersregulator.calepa.ca.govBusiness/45294/Facility/10181263/Submittal/UST/1397... 1/13/2016 <br />