ABBREVIATIONS ELECTRICAL SYMBOL LEGEND SECURITY SYSTEM NOTES TELEPHONE SYSTEM NOTES GENERAL ELECTRICAL NOTES
<br /> Imw
<br /> AFF ABOVE FINISHED FLOOR STARBUCKS CONTRACTS DIRECTLY WITH SECURITY VENDOR TO SUPPLY IF ADDITIONAL TELEPHONE LINES ARE REQUIRED BEYOND THE 1. THE ELECTRICAL CONTRACTOR SHALL COORDINATE ELECTRICAL
<br /> AHJ AUTHORITIES HAVING JURISDICTION O JUNCTON BOX RECEPTACLE: DUPLEX AND INSTALL THE SECURITY SYSTEM. CONTRACTOR TO SCHEDULE STANDARD SINGLE LINE (SUCH AS FOR A FIRE ALARM)THE GENERAL WORK AND SPECIFICATIONS WITH OTHER TRADES. THE
<br /> APPROX APPROXIMATE INSTALLATION OF SECURITY SYSTEM FOR FOUR (4)TIMES; CONTRACTOR SHALL CONTACT STARBUCKS PRIOR TO BEGINNING ARCHITECTURAL DRAWINGS AND SPECIFICATIONS SHALL TAKE
<br /> 1. MEET TO PLAN SECURITY CABLE PULL WITH SECURITY CABLE CONSTRUCTION TO ORDER THE ADDITIONAL TELEPHONE LINE(S). PRECEDENCE OVER ALL OTHER DRAWINGS. DO NOT SCALE
<br /> BLDG BUILDING $ SWITCH RECEPTACLE-. DUPLEX- INSTALLER PRIOR TO DRYWALL INSTALLATION. REPORT ANY TELEPHONE INSTALLATION ISSUES IMMEDIATELY TO DISTANCES OFF THE ELECTRICAL DRAWINGS; USE ACTUAL
<br /> n INDIVIDUAL BRANCH CIRCUIT 2. SECURITY CABLE INSTALLER PULLS SECURITY CABLES, MOUNTS STARBUCKS. BUILDING DIMENSIONS. OVERALL CASEWORK COMPONENT
<br /> CKT CIRCUIT PANEL, KEYPAD AND SENSORS. DIMENSIONING ON ELECTRICAL DETAILS ARE SHOWN FOR
<br /> CLG CEILING s THREE-WAY SWITCH # RECEPTACLE: QUAD 3. SECURITY EQUIPMENT INSTALL OF CAMERA, NVR AND MONITOR. CONFIRM PRIOR TO BEGINNING CONSTRUCTION THAT THERE ARE REFERENCE AND COORDINATION ONLY. SEE SPECIFICATION ©2017 STARBUCKS COFFEE COMPANY
<br /> CM STARBUCKS CONSTRUCTION MANAGER 4. SECURITY MONITORING COMPANY TO BRING SYSTEM ONLINE AND EXISTING, WORKING TELCO FACILITIES TO THE BUILDING OR THAT SHEETS FOR ELECTRICAL SPECIFICATIONS
<br /> CONST CONSTRUCTION TRAIN PARTNERS AFTER POS INSTALL. LANDLORD HAS FURNISHED AND INSTALLED ONE (1)2" (51MM) MIN.
<br /> CW COLD WATER MOTION (OCCUPANCY) RECEPTACLE: QUAD - (ENTRANCE) CONDUIT INCLUDING PULL STRING FROM TELCO STREET 2. ALL ELECTRICAL SYSTEMS SHALL BE TESTED FOR PROPER STARBUCKS COFFEE
<br /> CXA COMMISSIONING AGENT M SENSOR SWITCH INDIVIDUAL BRANCH CIRCUIT SECURITY VENDOR REQUIRES A MINIMUM TWO (2)WEEKS LEAD TIME FOR FEED LINE TO THE BUILDING AS IDENTIFIED BY THE PHONE COMPANY. OPERATION. BALANCE ALL BRANCH CIRCUIT LOADS BETWEEN
<br /> EACH INSTALLATION. SECURITY VENDOR WILL COORDINATE REGIONAL NOTIFY STARBUCKS CONSTRUCTION MANAGER IMMEDIATELY IF THE PHASES OF THE SYSTEM WITHIN 10% OF THE HIGHEST PHASE COMPANY
<br /> DEG DEGREES INSTALLERS. ALL ADDITIONAL EXPENSES INCURRED DUE TO THE FACILITIES OR CONDUIT AND PULL STRING ARE NOT INSTALLED. LOAD IN EACH PANEL BOARD. 2401 UTAH AVENUE SOUTH
<br /> DL LIGHTS WITHIN DAYLIGHT ZONE SWITCHBACK RECEPTACLE: HIGH VOLTAGE CONTRACTOR'S FAILURE TO SCHEDULE ACCORDINGLY WILL BE THE
<br /> GENERAL CONTRACTOR IS TO ENSURE THAT THERE IS A 2 (51 MM) MIN. 3. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR DE- SEATTLE, WASHINGTON 98134
<br /> "
<br /> DM STARBUCKS DESIGN MANAGER RESPONSIBILITY OF THE CONTRACTOR. (206) 318-1575
<br /> DN DOWN CONDUIT WITH PULL STRING FROM THE DATA RACK TO THE DEMARC ENERGIZING CIRCUITS IN DEMOLITION AREAS TO INSURE A SAFE
<br /> DTL DETAIL - TELEPHONE ® RECEPTACLE: FLOOR DUPLEX (TELCO TO CUSTOMER HAND OFF EQUIPMENT)WHEN THE DEMARC IS CONDITION. ELECTRICAL DEVICES AND ASSOCIATED WIRING THESE DRAWINGS AND SPECIFICATIONS ARE
<br /> DWG(S) DRAWING(S) MORE THAN 10' FROM THE DATA RACK. DISTANCES LESS THAN 10'WILL LOCATED WITHIN THE DEMOLITION AREA THAT WILL NO LONGER CONFIDENTIAL AND SHALL REMAIN THE SOLE
<br /> CARBON MONOXIDE NOT REQUIRE CONDUIT. BE USED SHALL BE REMOVED AND PROPERLY DISPOSED OF AT
<br /> EA EACH OT THERMOSTAT GROUNDING ELECTRODE CONTRACTORS EXPENSE UNLESS OTHERWISE NOTED. PROPERTY OF STARBUCKS CORPORATION,
<br /> EC ELECTRICAL CONTRACTOR — CONNECTION (CO) DETECTOR NOTES PROVIDE A 3-POSITION GROUND LUG, GROUNDED WITH#6 AWG WHICH IS THE OWNER OF THE COPYRIGHT IN
<br /> ECP EQUIPMENT CONTROL PAC GROUND WIRE, IF REQUIRED BY TELEPHONE COMPANY. 4. THE ELECTRICAL CONTRACTOR SHALL SCHEDULE ALL ELECTRICAL THIS WORK. THEY SHALL NOT BE
<br /> EG EXHAUST GRILLE SYSTEM OUTAGES WITH THE GENERAL CONTRACTOR AND REPRODUCED (IN WHOLE OR IN PART), SHARED
<br /> ELEC ELECTRICAL 0 THERMOSTAT SENSOR N� NIGHTLIGHTING 24HR/DAY COORDINATE INSTALLATION OF CARBON MONOXIDE (CO) DETECTOR ALL TELEPHONE/NETWORK CABLING IS THE SCOPE OF WORK OF THE LANDLORD AT LEAST 24 HOURS IN ADVANCE. UNLESS APPROVED WITH THIRD PARTIES OR USED IN ANY MANNER
<br /> EM EMERGENCY DEVICE(S)AND LOW VOLTAGE WIRING WITH STARBUCKS SECURITY TELEPHONE/NETWORK CABLING VENDOR. OTHERWISE ALL OUTAGES SHALL OCCUR BETWEEN 11:OOPM AND ON OTHER PROJECTS OR EXTENSIONS TO THIS
<br /> EMS ENERGY MANAGEMENT SYSTEM VENDOR FOR NEW STORES, RELOCATIONS AND MAJOR RENOVATIONS, IF 5:OOAM. PROJECT WITHOUT THE PRIOR WRITTEN
<br /> EXIST EXISTING [a DIMMER SWITCH PE PHOTOELECTRIC CELL IN VENDOR SCOPE. VENDOR TO PROVIDE AND INSTALL DEVICE(S) IN BOH CONSENT OF STARBUCKS CORPORATION.
<br /> EXT EXTERIOR AND FOH (AS APPLICABLE PER STARBUCKS STANDARDS). 5. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL THESE DRAWINGS AND SPECIFICATIONS ARE
<br /> NECESSARY CONDUIT AND J-BOXES TO SUPPORT A COMPLETE INTENDED TO EXPRESS DESIGN INTENT FOR A
<br /> F&I FURNISH & INSTALL ® RECEPTACLE-. DATA SPEAKER POS \ DATA LINE NOTES SECURITY, PHONE, POS AND DATA SYSTEMS. SEE MANAGER PROTOTYPICAL STARBUCKS STORE (WHICH IS
<br /> FLR FLOOR WORKSTATION AND BAR POINT OF SALE (POS) SUBJECT TO CHANGE AT ANYTIME)AND DO
<br /> FT FOOT/FEET FIRE ALARM SYSTEM NOTES POWER/TELECOM/SECURITY DIAGRAM. COORDINATE ALL DEVICE NOT REFLECT ACTUAL SITE CONDITIONS.
<br /> STARBUCKS CONTRACTS DIRECTLY WITH THE DATA CABLING VENDOR LOCATIONS AND MOUNTING HEIGHTS WITH SECURITY VENDOR NEITHER PARTY SHALL HAVE ANY OBLIGATION
<br /> GC GENERAL CONTRACTORS RACEWAY CONCEALED WIFI ACCESS POINT TO SUPPLY AND INSTALL CATEGORY 5e (CAT5e) LAN CABLE ANDIN CEILING OR WALLNOR LIABILITY TO THE OTHER (EXCEPT STATED
<br /> . PRIOR TO ROUGH-IN. PROVIDE END-TO-END PULL STRINGS IN ALL
<br /> GFCI GROUND FAULT CIRCUIT INTERRUPTER IF STARBUCKS IS REQUIRED TO PROVIDE A FIRE ALARM AND/OR FIRE CONNECTORS FOR THE POINT OF SALE (POS) SYSTEMS. CONTRACTOR CONDUITS. LABEL EACH END OF THE PULL STRING WITH CONDUIT ABOVE) UNTIL A WRITTEN AGREEMENT IS
<br /> GND GROUND HASH MARKS INDICATE ALARM MONITORING AND/OR PHONE LINES FOR A FIRE ALARM, AS TO SCHEDULE INSTALLATION OF DATA CABLING WITH DATA CABLING SYSTEM ("SECURITY")AND DESTINATION ("CAFE", "FRONT BAR", FULLY EXECUTED BY BOTH PARTIES.
<br /> NUMBER OF WIRES. SPECIFIED IN THE LEASE AGREEMENT, THE CONTRACTOR IS TO NOTIFY VENDOR. DATA CABLING VENDOR REQUIRES A LEAD TIME FOR ETC.). PROVIDE INSULATED BUSHINGS ON ALL STUBBED-UP AND
<br /> HR HOUR #12 AWG WIRE UNLESS GNOC IMMEDIATELY THAT FIRE ALARM LINES ARE NEEDED. STARBUCKS INSTALLATION. DATA CABLING VENDOR WILL COORDINATE REGIONAL EXPOSED CONDUIT ENDS.
<br /> HVAC HEATING, VENTILATION, AIR CONDITIONING OTHERWISE NOTED. PREFERRED FIRE ALARM SERVICE PROVIDER, STANLEY, IS TO BE INSTALLERS. ARCHITECT OF RECORD
<br /> HW HOT WATER TWO WIRES PLUS CONTACTED BY THE CONSTRUCTION MANAGER TO INSTALL FIRE ALARM mcg architecture
<br /> GROUND IF NO HASH 6. ELECTRICAL CONTRACTOR SHALL COORDINATE WITH THE
<br /> PANEL AND/OR MONITORING SERVICE AS REQUIRED. AT THE START OF CONSTRUCTION, STARBUCKS CONSTRUCTION GENERAL CONTRACTOR TO PATCH AND REPAIR ALL EXISTING o = � � •
<br /> LCP LIGHTING CONTROL PANEL MARKS SHOWN. LONG MANAGER SCHEDULES DELIVERY OF CASH REGISTER/MANAGER'S '_
<br /> HASH MARK DENOTES WALLS, FLOORS, CEILINGS OR OTHER SURFACES IDENTIFIED TO �
<br /> LL LANDLORD WORKSTATION EQUIPMENT AND INSTALLATION BY A POS INSTALL REMAIN THAT MAY BECOME DAMAGED DURING THE COURSE OF
<br /> LS LIGHT SENSOR PHOTOCELL NEUTRAL. TECHNICIAN FOR ONE (1) MONTH PRIOR TO STORE OPEN.
<br /> LV LOW VOLTAGE GROUND WIRE NOT ENERGY MANAGEMENT SYSTEM (EMS) CONTRACTOR TO VERIFY DELIVERY SCHEDULE TWO (2)WEEKS PRIOR WORK. N oil
<br /> SHOWN. TO DELIVERY AND INSTALLATION DATE. EQUIPMENT IS SHIPPED 7. EXPOSED/SURFACE MOUNTED CONDUITS SHALL ONLY BE
<br /> MAX MAXIMUM DIRECTLY TO THE STORE. CONTRACTOR TO ACCEPT POS EQUIPMENT ALLOWED WHERE NECESSARY IN EXPOSED CEILING AREAS. IF 111 Pacifica, Suite 280, Irvine,CA 92618
<br /> MC MECHANICAL CONTRACTOR THE GENERAL CONTRACTOR SHALL CONTACT AND COORDINATE DELIVERY. DO NOT REFUSE DELIVERY. CONDUITS NEED TO BE SURFACE MOUNTED TO WALLS, P: 949.553.1117 F:949.474.7056
<br /> MDP MAIN DISTRIBUTION PANEL INSTALLATION OF<INSERT LCP PRODUCT>AND<INSERT EMS SYSTEM> COORDINATE WITH STARBUCKS CONSTRUCTION MANAGER FOR
<br /> MECH MECHANICAL WITH EMS INSTALLER. PRIOR TO LAST WEEK OF CONSTRUCTION. DATA CABLING TECHNICIAN TO PROVIDE ALL CAT5e LAN CABLING AND APPROVAL.
<br /> FURNISH AND INSTALL TEMPORARY THERMOSTATS AND SENSORS, AND _.kOFESSItiti
<br /> MEP MECHANICAL, ELECTRICAL, AND PLUMBING CONNECTORS FROM ALL DESIGNED AND FUTURE CASH REGISTER
<br /> MFG MANUFACTURER ROUTE ALL LOW VOLTAGE WIRING THROUGH EC PROVIDED CONDUITS LOCATIONS, MANAGER'S WORKSTATION, ALL OTHER NETWORKED rr,^QRQFES$/pNg1t11
<br /> ACTES
<br /> (COORDINATE WITH ELECTRICAL). 8. VERIFY LOCATION OF ALL OUTLETS AND SWITCHES WITH
<br /> MIN MINIMUM EQUIPMENT (CUP LABELERS, CLOVER, BUMP BAR, ETC...)AND
<br /> ARCHITECTURAL DRAWINGS, INTERIOR DETAILS, FINISH ENGINEERING
<br /> WIRELESS ACCESS POINT TO THE DATA RACK AREA. CONTRACTOR IS SCHEDULES, GENERAL CONTRACTOR, EQUIPMENT VENDORS, 3371 Olcott Street v� cm
<br /> NL NIGHTLIGHT FURNISH AND INSTALL RACEWAYS WITH PULL STRINGS AND TO HAVE CONDUIT WITH PULL STRING IN PLACE FOR ALL CABLE RUNS �+
<br /> STARBUCKS AND EXISTING SITE CONDITIONS. VERIFY FINAL DOOR Santa Clara,CA 95054 l . 15130 A 1
<br /> NTS NOT TO SCALE JUNCTION BOXES FOR THERMOSTAT(S)AND SENSOR(S). PRIOR TO CABLE INSTALL DATE. HINGE LOCATION PRIOR TO SWITCH INSTALLATION AND ADJUST ph:(408)522-5255 xp.0¢/30/20 l
<br /> SWITCH LOCATION IF NEEDED. DO NOT MOUNT fx: 408 522-5260 tai '
<br /> OCP OVERCURRENT PROTECTION SET RESTROOM OCCUPANCY SENSOR TO 15 MINUTE 'ON' DURATION STARBUCKS NEW STORE GROUP IS RESPONSIBLE FOR COORDINATING ( ) 22 J! ! Gp �Q rr
<br /> IN SINGLE OCCUPANT RESTROOM AND TO 20 MINUTE `ON' DURATION
<br /> STARBUCKS POS SYSTEMS DELIVERY AND INSTALLATION WITH THE POS WITH MIRRORS, SEAMS OF WALLS, WAINSCOTS,WOULD CONFLICT Cofor@htic 2019 211iiti0F CA�vFO``���r
<br /> REF REFERENCE IN MULTI-OCCUPANT RESTROOM UNLESS JURISDICTION VENDOR. THIS GROUP MAY BE CONTACTED AT: TRANSITIONS, ETC... pY 9 O
<br /> REQ('D) REQUIRE(D) REQUIREMENTS STATE OTHERWISE. NEWSTORES@STARBUCKS.COM .
<br /> REV REVISION
<br /> COORDINATE WITH DRAWINGS AND LCP VENDOR FOR DEVICE
<br /> SF SQUARE FEET LOCATIONS. VENDOR SHALL COMMISSION CONTROLS.
<br /> SPT SHEET COMMUNICATION SYSTEM NOTES GENERAL NOTES
<br /> SPECS SPECIFICATION(S) THE GENERAL CONTRACTOR IS TO COMPLETE FINAL CONNECTION
<br /> SST STAINLESS STEEL AFTER DATA RACK AND NETWORK INSTALLATION. THE GENERAL
<br /> CONTRACTOR IS TO CONTACT LCP VENDOR TO VERIFY SYSTEM CONFIRM PRIOR TO BEGINNING CONSTRUCTION THAT THE LANDLORD HAS SCOPE
<br /> TEL TELEPHONE OPERATION AND TROUBLESHOOT IF REQUIRED. FURNISHED AND INSTALLED ONE (1)ADDITIONAL 2" (51 MM) (ENTRANCE) THE INTENT OF THE SPECIFICATION AND THE DRAWINGS IS TO PROVIDE W
<br /> TEMP TEMPORARY CONDUIT INCLUDING PULL STRING (FOR A TOTAL OF TWO (2)) FROM THE A COMPLETE AND FULLY OPERATIONAL ELECTRICAL SYSTEM. THE
<br /> TYP TYPICAL STREET FEED TO THE BUILDING AS IDENTIFIED BY THE INTERNET SERVICE ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL LABOR,
<br /> PROVIDER. MATERIAL, AND EQUIPMENT NECESSARY TO COMPLETE THE
<br /> UNO UNLESS NOTED OTHERWISE CONTROLS AND OPERATION ELECTRICAL WORK.
<br /> WH WATER HEATER SITE EXAMINATION W (y)
<br /> WP WEATHER PROOF THE GENERAL CONTRACTOR SHALL CONTACT AND COORDINATE WIRELESS NETWORK NOTES THE ELECTRICAL CONTRACTOR SHALL THOROUGHLY EXAMINE ALL �
<br /> INSTALLATION OF LIGHTING CONTROL PANEL WITH "LUTRON" PRIOR AREAS WHERE EQUIPMENT, CONDUIT, AND WIRING WILL BE INSTALLED
<br /> TO THE LAST WEEK OF CONSTRUCTION. AND WILL REPORT ANY CONDITION THAT, IN HIS OPINION, PREVENTS O fl� 0)
<br /> FURNISH AND INSTALL RACEWAYS WITH PULL STRINGS AND JUNCTION CABLING FOR INTERNET SERVICE SHALL BE FURNISHED AND INSTALLED THE PROPER INSTALLATION OF THE ELECTRICAL WORK. � (n
<br /> BOXES FOR THERMOSTAT(S)AND SENSOR(S). BY THE VENDOR FOR FIBER OR BROADBAND CONNECTIONS. T1 AND z
<br /> STANDARDS W U
<br /> ETHERNET EXTENSION CABLING IS PROVIDED BY THE STARBUCKS EQUIPMENT AND MATERIALS SHALL CONFORM WITH APPROPRIATE
<br /> 06 SET RESTROOM OCCUPANCY SENSOR TO 15 MINUTE 'ON' DURATION IN (TELEPHONE/ NETWORK) CABLING VENDOR. COORDINATE WITH p z Q
<br /> SINGLE OCCUPANT RESTROOM AND TO 20 MINUTE 'ON' DURATION IN STARBUCKS. PROVISIONS OF CSA, ULC, NEC, ASTM, UL, ETC, NEMA, ANSI, AS f APPLICABLE TO EACH INDIVIDUAL UNIT OR ASSEMBLY. z Z Q U
<br /> MULTI-OCCUPANT RESTROOM UNLESS JURISDICTION REQUIREMENTS � w
<br /> STATE OTHERWISE. CODES C) O c) U
<br /> ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH ALL W W
<br /> COORDINATE WITH DRAWINGS AND LCP VENDOR FOR DEVICE APPLICABLE PROVINCIAL AND LOCAL CODES AND ORDINANCES. IN CASEO z m z
<br /> LOCATIONS. VENDOR SHALL COMMISSION CONTROLS. MUSIC SYSTEM NOTES OF CONFLICT BETWEEN THE DRAWINGS AND SPECIFICATIONS AND THE � � (V C�C
<br /> THE GENERAL CONTRACTOR IS TO COMPLETE FINAL CONNECTION AFTER CODES, THE HIGHEST STANDARD SHALL APPLY. ELECTRICAL W d G
<br /> DATA RACK AND NETWORK INSTALLATION. THE GENERAL CONTRACTOR MOUNT OWNER FURNISHED SPEAKERS WHERE SHOWN ON INTERIOR CONTRACTOR SHALL SATISFY CODE REQUIREMENTS AS A MINIMUM
<br /> IS TO CONTACT LCP VENDOR TO VERIFY SYSTEM OPERATION AND REFLECTED CEILING PLANS AND IN COORDINATION WITH ALL PLANS, STANDARD WITHOUT ANY EXTRA COST TO STARBUCKS. STORE #: 11830
<br /> TROUBLESHOOT IF REQUIRED. DETAILS AND MANUFACTURER'S INSTALLATION REQUIREMENTS. PERMITS AND FEES PROJECT #: 37913-049
<br /> INSTALL AND CONNECT OWNER FURNISHED WIRING SYSTEM BETWEEN THE ELECTRICAL CONTRACTOR SHALL PROCURE AND PAY FOR ALL
<br /> ALL SPEAKERS AND THE OWNER PROVIDED MUSIC SYSTEM. SET PERMITS, FEES, AND INSPECTIONS NECESSARY TO COMPLETE THE PROFILE TYPE: CORE
<br /> WATTAGE TAP ON EACH SPEAKER'S ROTARY SWITCH PER TAP SETTINGS ELECTRICAL WORK. ISSUE DATE:
<br /> NOTED ON PLANS.
<br /> PROGRAM MANAGER: M.DREBIKA
<br /> WARRANTY STORE DESIGNER: T.MARINIC
<br /> THE ELECTRICAL CONTRACTOR SHALL UNCONDITIONALLY WARRANT
<br /> ALL WORK TO BE FREE OF DEFECTS IN MATERIAL AND WORKMANSHIP LEED®AP: N/A
<br /> FOR A PERIOD OF ONE (1)YEAR FROM THE DATE OF FINAL ACCEPTANCE CHECKED BY:
<br /> SCOPE OF WORK BY STARBUCKS AND WILL REPAIR OR REPLACE ANY DEFECTIVE WORK ACIES PROJECT#: 190478
<br /> PROMPTLY AND WITHOUT CHARGE AND RESTORE ANY OTHER EXISTING
<br /> WORK DAMAGED IN THE COURSE OF REPAIRING DEFECTIVE MATERIALS ACIES PROJ. MANAGER: HT
<br /> - COMPLETE INTERIOR LIGHTING AND LIGHTING CONTROLS CHANGES. AND WORKMANSHIP. ACIES PROJ. SPECIALIST: TG
<br /> - POWER CHANGES FOR NEW FOOD SERVICE EQUIPMENT IN THE BAR
<br /> -ALL PANELS ARE EXISTING TO REMAIN. LEED
<br /> ALL WORK, MATERIALS AND EQUIPMENT SHALL MEET LEED Revision Schedule
<br /> REQUIREMENTS &CODE. IN CASE OF CONFLICT, THE HIGHER
<br /> STANDARD SHALL APPLY. Rev Date By Description
<br /> LANDLORD REQUIREMENTS
<br /> PRIOR TO BID: THE CONTRACTOR SHALL COORDINATE WITH LANDLORD/ SHEET TITLE:
<br /> BUILDING OWNER FOR ANY CONSTRUCTION REQUIREMENTS/ ELECTRICAL NOTES
<br /> SPECIFICATIONS. IF LANDLORD/ BUILDING OWNER DOES HAVE
<br /> REQUIREMENTS, CONTRACTOR SHALL BECOME COMPLETELY FAMILIAR
<br /> WITH REQUIREMENTS/SPECIFICATIONS AND ADHERE TO THEM. WHERE
<br /> LANDLORD/ BUILDING OWNER REQUIREMENTS ARE MORE STRINGENT SCALE: AS SHOWN
<br /> THAN SHOWN IN THESE PLANS (IN THE OPINION OF THE ENGINEER).
<br /> LANDLORD/ BUILDING OWNER REQUIREMENTS SHALL GOVERN. SHEET NUMBER:
<br /> E-001