STATE OF CALIFORNIA STATE OF CALIFORNIA VOLTAGE DROP CALCULATION (2081120V SYSTEM)
<br /> Electrical Power Distribution Electrical Power Distribution
<br /> CEC-NRCC-ELC-01-E(Revised 01/16) CALIFORNIA ENERGY COMMISSION CEC-NRCC-ELC-01-E(Revised 01/16) CALIFORNIA ENERGY COMMISSION BRANCH CIRCUIT: 3% MAX
<br /> CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E LOAD PER MAXIMIM SIZE GROUND WIRE MAXIMUM LENGTH OF BRANCH CIRCUIT PER NOTES AND
<br /> Electrical Power Distribution Page 1 of 4 Electrical Power Distribution Page 2 of 4 PHASE CB WIRE SIZE SIZE UTILIZATION VOLTAGE REMARKS
<br /> Project Name: Date Prepared: Project Name: Date Prepared:
<br /> STARBUCKS @ Union and Yosemite 11/15/2019 STARBUCKS @ Union and Yosemite 11/15/2019 (KVA) (A) (AWG) (AWG) (120V,1 PH) (208V,1 PH) (208V,3PH)
<br /> General Information B.Separation of Electrical Circuits for Electrical Energy Monitoring <1.92 20 #12 #12 56 FT. 85 FT. 98 FT. A
<br /> Project Address: Climate Zone: Conditioned Floor Area: Check all boxes below if the electrical power distribution system is in compliance with Section 130.5(b). #10 #10 94 FT. 141 FT. 163 FT. A
<br /> 129 S.Union Rd.Manteca,CA 95337 12 1,695 The electrical power distribution system meets the separation of electrical circuits for electrical energy monitoring requirement of Section #8 #8 144 FT 217 FT. 250 FT. A
<br /> Unconditioned Floor Area: ❑ 130.5(b).The electrical power distribution systems is designed so that measurement devices can monitor the electrical energy usage of load types #6 #6 230 FT. 345 FT. 398 FT A
<br /> Building Type: ZNonresidential ❑ High-Rise Residential ❑ Hotel/Motel according to TABLE 130.5-B. <1.44 20 #12 #12 75 FT. 113 FT. 130 FT. A ©2017 STARBUCKS COFFEE COMPANY
<br /> ❑ Describe the electrical power distribution system installed and the compliance method chosen in meeting the requirement of Section 130.5(b). #10 #10 125 FT. 188 FT. 217 FT. A
<br /> ❑Schools ❑ Relocatable Public Schools ❑✓ Conditioned Spaces ❑ Unconditioned Spaces Use the space below to include the information.Examples of compliance methods are detailed in Nonresidential Compliance Manual Chapter 8.
<br /> Phase of Construction: E] New Construction ❑ Addition ZAlteration Fill out Column 1 thru 3 with the compliance information. #8 #8 192 FT 289 FT. 334 FT A STARBUCKS COFFEE
<br /> General Information
<br /> Electrical Power Distribution System information Electrical Service Enforcement #6 #6 306 FT. 460 FT. 531 FT. A COMPANY
<br /> and Method of compliance Rating Agency <1.26 20 #12 #12 86 FT. 129 FT. 149 FT.
<br /> In the table below identify all applicable construction documents that specify the requirements for the scope of responsibility reported 2401 UTAH AVENUE SOUTH
<br /> by this certificate. Use additional pages as needed to list all construction documents related to compliance of Section 130.5. 01 02 03 04 #10 #10 143 FT. 215 FT. 248 FT. SEATTLE, WASHINGTON 98134
<br /> Electrical Service Describe the electrical power distribution system kVA Check that the #8 #8 220 FT 330 FT. 381 FT. (206) 318-1575
<br /> Document Title/Descriptions Indicate which subsection of Designation/Location/Description installed and the compliance method used system complies <1.08 20 #12 #12 100 FT. 150 FT. 173 FT.
<br /> Document Number (include description information for Document Sheet#or Section 130.5 is related to the EXISTING PANEL"A" EXISTING PANEL"A" 120.22 THESE DRAWINGS AND SPECIFICATIONS ARE
<br /> Table or Schedule if it contains Page# document(e.g. 130.5(a)for 120/208V,3PH,4W,200A 65.16KVA #10 #10 167 FT. 250 FT. 289 FT. CONFIDENTIAL AND SHALL REMAIN THE SOLE
<br /> compliance information) service electrical metering) #8 #8 256 FT 385 FT. 445 FT. PROPERTY OF STARBUCKS CORPORATION,
<br /> EXISTING PANEL"B" EXISTING PANEL"B"
<br /> 1zo/zogv,3PH,4W,200A 55.06KVA <0.9 20 #12 #12 120 FT. 180 FT. 208 FT. WHICH IS THE OWNER OF THE COPYRIGHT IN
<br /> N/A SINGLE LINE DIAGRAM E-601 THIS WORK. THEY SHALL NOT BE
<br /> #10 #10 200 FT. 300 FT. 347 FT. THIS
<br /> (IN WHOLE OR IN PART), SHARED
<br /> Add Row Remove Last <0.72 20 #12 #12 150 FT. 225 FT. 260 FT. WITH THIRD PARTIES OR USED IN ANY MANNER
<br /> #10 #10 250 FT. 376 FT. 434 FT. ON OTHER PROJECTS OR EXTENSIONS TO THIS
<br /> A.Service Electrical Metering PROJECT WITHOUT THE PRIOR WRITTEN
<br /> Check one of the three boxes below if the electrical power distribution system is in compliance with Section 130.5(a). CONSENT OF STARBUCKS CORPORATION.
<br /> 1. CONTRACTOR SHALL FEFER TO THIS TABLE PRIOR TO START OF BRANCH CIRCUIT ROUGH-1 N. THESE DRAWINGS AND SPECIFICATIONS ARE
<br /> ® For newly installed electrical service in newly constructed buildings,Service Electrical Metering is required according to Section 130.5(a).Fill out INTENDED TO EXPRESS DESIGN INTENT FOR A
<br /> Column 1 through 6 o table below. ❑ 2. CONTRACTOR SHALL USE THE APPROPRIATE WIRE SIZE IN CONJUNCTION WITH THE LENGTH OF THE PROPOSED PROTOTYPICAL STARBUCKS STORE (WHICH IS
<br /> ❑ For new or replacement electrical service equipment in existing buildings,Service Electrical Metering is required according to Section 141.0(b)2Pi. FIELD VERIFIED ROUTING OF BRANCH CI RCUIT WI RI NG(INCLUDING VERTICAL& LATERAL RUN, ROUTED SUBJECT TO CHANGE AT ANYTIME)AND DO
<br /> Fill out Column 1 through 6 o table below. PARALLEL/ PERPENDICULAR TO THE BUILDING STRUCTURE. NOT REFLECT ACTUAL SITE CONDITIONS.
<br /> NEITHER PARTY SHALL HAVE ANY OBLIGATION
<br /> ❑ EXCEPTION to Electrical Service Metering:Service or feeder for which the utility company provides a metering system that indicates instantaneous SEE PANEL SCHEDULE FOR THE CORRESPON DING KVA LOAD PER PHASE OF A PARTICULAR BRANCH CI RCUIT. NOR LIABILITY TO THE OTHER (EXCEPT STATED
<br /> kW demand and kWh for a utility-defined period.Fill out Column 1,2 and 6of table below with the compliance information. 4. RESISTANCE VALUES ARE FOR UNCOATED COPPER WIRES IN STEEL CONDUIT, 75 DEGREE C., OPERATING AT 60 HZ. ABOVE) UNTIL A WRITTEN AGREEMENT IS
<br /> Fill out a separate line for each electrical service that is connected to the building. FULLY EXECUTED BY BOTH PARTIES.
<br /> Electrical Service Schedule Electrical Metering Capabilities(check all that are present) Exception to Field Inspector
<br /> Service Rating 130.5(a) NOTES:
<br /> ARCHITECT OF RECORD
<br /> 01 02 03 04 05 06 07 08 A = THE VALUES IN 120V, 1P H" COLUMN IS TO BE USE FOR GEN ERAL PURPOSE RECEPTACLE LOADS. mcg architecture
<br /> U C U C
<br /> Tracking kWh Field Ins Inspector Notes: � a)
<br /> Instantaneous Check that the p c > o
<br /> Electrical Service Designation/ Historical for a user- kWh per Utility metering E2 2
<br /> kVA (at the time) metering
<br /> Location/Description kW peak(kW) definable rate period system complies U
<br /> c
<br /> period cn
<br /> 41
<br /> 111 Pacifica,Suite 280, Irvine,CA 92618
<br /> P:949.553.1117 F:949.474.7056
<br /> FIRST FLOOR 120.22 ❑ ❑ ❑ ® ❑ El
<br /> ve Last
<br /> ACIES �~FESS�1
<br /> � ttt
<br /> rr QROFESS/pN ttt
<br /> ENGINEERING rh��o�\SLAV 1 Cy'Fc22tjl
<br /> 3371 Olcott Street
<br /> Santa Clara,CA 95054 1 15130/30
<br /> z
<br /> ph:(408)522-5255 1 E'D � 1
<br /> fx:(408)522-5260 rtip� Q rrr
<br /> info@acies.net ttz q2�FCTR
<br /> CA Building Energy Efficiency Standards-2016 Nonresidential Compliance January 2016 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance January 2016 Copyr ght©2019 tttt 1 Opti p,�\F0�
<br /> STATE OF CALIFORNIA STATE OF CALIFORNIA
<br /> Electrical Power Distribution Iffilk Electrical Power Distribution
<br /> CEC-NRCC-ELC-01-E(Revised 01/16) CALIFORNIA ENERGY COMMISSION CEC-NRCC-ELC-01-E(Revised 01/16) CALIFORNIA ENERGY COMMISSION
<br /> CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E
<br /> Electrical Power Distribution Page 3 of 4 Electrical Power Distribution Page 4 of 4
<br /> Project Name: Date Prepared: Project Name: Date Prepared:
<br /> STARBUCKS @Union and Yosemite 11/15/2019 STARBUCKS @Union and Yosemite 11/15/2019
<br /> C.Voltage Drop Enforcement Agency DOCUMENTATION AUTHOR'S DECLARATION STATEMENT W
<br /> Check all boxes below if he electrical power distribution system is in compliance with Section 130.5(c). Check that the system 1. 1 certify that this Certificate of Compliance documentation is accurate and complete.
<br /> complies Documentation Author NameTOMISLAVZ. GAJIC Documentation Author Signature:
<br /> ❑✓ The electrical power distribution system meets the voltage drop requirement of Section 130.5(c).The CompanyACIES ENGINEERING signature Date:11/15/2019
<br /> maximum combined voltage drop on feeder conductors and branch circuit conductors to the farthest ❑ Address: CEA/HERS Certification Identification(if applicable): W co
<br /> connected load or outlet,do not exceed 5%. 3371 OLCOTT STREET '
<br /> city/state/zi`:SANTA CLARA, CA 95054 Phone:
<br /> 522-5255 vJ Q
<br /> ❑ Voltage drop calculation documents showing compliance to Section 130.5(c)are submitted as part of the RESPONSIBLE PERSON'S DECLARATION STATEMENT O
<br /> compliance document submittal. ❑ I certify the following under penalty of perjury,under the laws of the State of California: 7
<br /> 1. The information provided on this Certificate of Compliance is true and correct. W L
<br /> 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified W 06 � O
<br /> on this Certificate of Compliance(responsible designer). Q Q 7 Q
<br /> 3. The energy features and performance specifications,materials,components,and manufactured devices for the building design or system L U
<br /> D.Circuit Controls for 120-Volt Receptacles and Controlled Receptacles Field Inspector design identified on this Certificate of Compliance conform to the requirements of Title 24,Part 1 and Part 6 of the California Code of z Q LIJ
<br /> Check one or more boxes below for applicable requirements of Section 130.5(d)for the electrical power Check that the system O
<br /> Regulations. U U �^
<br /> distribution system. complies W W vJ Z
<br /> 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information � �
<br /> ❑ The control is capable of automatically shutting OFF the controlled receptacles when the space is typically provided on other applicable compliance documents,worksheets,calculations,plans and specifications submitted to the enforcement O z O Q
<br /> unoccupied,either at the receptacle or circuit level.For the automatic time switch control,it incorporates an agency for approval with this building permit application. CSI
<br /> override control that allows the controlled receptacle to remain ON for no more than 2 hours when an
<br /> 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s)issued for the W d
<br /> override is initiated and an automatic holiday"shut-OFF"feature that turns OFF all loads for at least 24 hours ❑ building,and made available to the enforcement agency for all applicable inspections.I understand that a completed signed copy of this
<br /> and then resumes the normally scheduled operation.Countdown timer switches are not be used to comply Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. STORE #: 1 1 830
<br /> with the automatic time switch control requirements.The controls meet the requirement of Section 130.5(d)1. Responsible Designer Name TOMISLAV Z. GAJIC Responsible Designer Signature: PROJECT #: 37913-049
<br /> company' Date Signed:11/15/2019
<br /> There is at least one controlled receptacle within 6 ft from each uncontrolled receptacle.Where receptacles PROFILE TYPE: CORE
<br /> are installed in modular furniture in open office area,at least one controlled receptacle is installed at each ❑ Address:3371 OLCOTT STREET License:E15130 ISSUE DATE:
<br /> workstation.The receptacles meet the requirement of Section 130.5(d)2. city/state/zip:SANTA CLARA, CA 95054 Phone:(408)522-5255 PROGRAM MANAGER: M.DREBIKA
<br /> ❑ There are installed split wired receptacles with at least one controlled and one uncontrolled receptacle. STORE DESIGNER: T.MARINIC
<br /> Where receptacles are installed in modular furniture in open office area,at least one controlled receptacle is ❑ LEED(D AP: N/A
<br /> installed at each workstation.The receptacles meet the requirement of Section 130.5(d)2. CHECKED BY:
<br /> ® Permanent and durable marking for controlled receptacles or circuits to differentiate them from uncontrolled ACIES PROJECT#: 190478
<br /> receptacles or circuits is provided.The markings meet the requirement of Section 130.5(d)3. ElACIES
<br /> PROJ. MANAGER: HT
<br /> ® For hotel and motel guest rooms,there are controlled receptacles for at least one-half of the 120-volt ACIES PROD. SPECIALIST: TG
<br /> receptacles in each guest room.Electric circuits serving controlled receptacles in guestrooms are installed to
<br /> have captive key controls,occupancy sensing controls,or automatic controls so the power is switched off no ❑ Revision Schedule
<br /> longer than 30 minutes after the guest room has been vacated.The receptacles meet the requirement of
<br /> Section 130.5(d)4. Rev Date By Description
<br /> ❑ Receptacles that are only for the following purposes are excepted from Section 130.5(d):
<br /> Receptacles specifically for refrigerators and water dispensers in kitchen areas.
<br /> Receptacles located a minimum of six ft above the floor that are specifically for clocks.
<br /> Receptacles for network copiers,fax machines,A/V and data equipment other than personal computers in ❑
<br /> copy rooms.
<br /> Receptacles on circuits rated more than 20 amperes.
<br /> SHEET TITLE:
<br /> -Receptacles connected to an uninterruptible power supply(UPS)that are intended to be in continuous ELECTRICAL POWER
<br /> use,24 hours per day/365 days per year,and are marked to differentiate them from other uncontrolled
<br /> receptacles or circuits. DISTRIBUTION FORMS
<br /> SCALE: AS SHOWN
<br /> SHEET NUMBER:
<br /> CA Building Energy Efficiency Standards-2016 Nonresidential Compliance January 2016 CA Building Energy Efficiency Standards-2016 Nonresidential Compliance January 2016
<br /> E-006
<br />
|