Laserfiche WebLink
U` <br /> GETTLER-RYAN INC. GR Job# 17200032 <br /> D. Results of Testing/Servicing RECEIVED <br /> Software Version Installed: 330.01 FEB 10 2017 <br /> Complete the following checklist: <br /> es ❑ o Is the audible alarm operational? , , TFi <br /> Yes ❑ No' Is the visual alarm operational? i / <br /> EN <br /> ry Yes ❑ No` Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Yes ❑ No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> proper operation? <br /> Yes ❑ No' If alarms are relayed to a remote monitoring station,is all communication equipment(e.g.modem)operational? <br /> [3N/A <br /> ff Yes ❑ No' For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring system <br /> ❑ N/A detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive shut-down?(Check all that apply) <br /> FASumprrrench Sensor, G Dispenser Containment Sensor.Did you confirm positive shut-down due to leaks and sensor <br /> failure/disconnection? E Yes, ❑ No. <br /> Yes ❑ No' For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical overfill prevention <br /> ❑ N/A valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly?If so,at what percent <br /> of tank capacity does the alarm trigger? 90 % <br /> E Yes ❑ No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes No Was liquid found inside any secondary containment systems designed as dry systems?(Check all that apply) []Product; ❑Water. If <br /> yes,describe causes in Section E,below. <br /> Yes ❑ No' Was monitoring system set-up reviewed to insure proper settings?Attach set-up reports,if applicable. <br /> Yes ❑ No' Is all monitoring equipment operational per manufacture's specifications? <br /> 'In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> 87 Fill 794380-208 sensor failed. <br /> Changed out sensor-Retested and passed. <br /> Monitoring System Certification Page 2 of 4 12/07 <br /> 2 <br />