My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 2:27:53 PM
Creation date
5/7/2020 9:58:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
410
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GET FL ER-RYAN INC. ' ` GR Jo # <br /> RFOVQ�D <br /> D. Results of Testing/Servicing <br /> FEB 0 9 2016 <br /> Software Version Installed: 330.01 <br /> Complete the following checklist: ENVIRONMENTAL <br /> tl CA',/ R I,`ONMENT'A`L <br /> (-y yes o Is the audible alarm operational? - <br /> ff Yes No' Is the visual alarm operational? <br /> E Yes No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Yes No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> proper operation? <br /> Yes No' If alarms are relayed to a remote monitoring station,is all communication equipment(e.g.modem)operational? <br /> rA N/A <br /> Yes No' For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring system <br /> N/A detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive shut-down?(Check all that apply) <br /> E Sumprrrench Sensor; G Dispenser Containment Sensor.Did you confirm positive shut-down due to leaks and sensor <br /> failure/disconnection? E Yes; E) No. <br /> E Yes No' For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical overfill prevention <br /> N/A valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly?If so,at what percent <br /> of tank capacity does the alarm trigger? 90 <br /> E Yes 0 No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> Yes ❑ No Was liquid found inside any secondary containment systems designed as dry systems?(Check all that apply) O product; ®Water. If <br /> yes,describe causes in Section E,below. <br /> Yes ❑ No' Was monitoring system set-up reviewed to insure proper settings?Attach set-up reports,if applicable. <br /> E Yes I Q No' Is all monitoring equipment operational per manufacture's specifications? <br /> `In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Replaced both annular sensors(7943820-303)at time of TMC <br /> Removed small amount of rain water from sumps and left on site ijn a labeled haz drum <br /> 91/Diesel split tank. <br /> Monitoring System Certification Page 2 of 4 12/07 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.