My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 2:27:53 PM
Creation date
5/7/2020 9:58:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
410
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iaGirrIEN-RrAtilt INC. GR Job# 20-640102 <br /> F. In-Tank Gauging I SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist <br /> {E es (] o Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> E Yes ❑ No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes ❑ No' Was accuracy of system products level readings tested? <br /> FL Yes ❑ No- Was accuracy of system water level readings tested? <br /> r, Yes ❑ No Were all probes reinstalled property? <br /> Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist compleled? <br /> In the Section H,below,describehow and when these de is enc es were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLDS are not installed. <br /> Complete the following checklist: <br /> �y es o or equipment Stan-up or annuat equipment certification,was a leak Simulated lo venry UU pe ormance ec a <br /> ❑ NIA that apply) Simulated leak rate: Q 3 g p.h ❑ 0.1 g.p.h. ❑ 0 2 g p.h. <br /> ra Yes ❑ No' Were all LLDS confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ No' Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ NO- For Mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> E N/A <br /> Yes ❑ No' For electronic LLDS,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N!A <br /> Yes ❑ No' For electronic LLDS,does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> ❑ WA Disconnected? <br /> Yes ❑ No' For electronic LLDS,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> (� N/A fails a test? <br /> Yes ❑ No' For electronic LLDS have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> �y Yes <br /> [1 0: were ail items on the equipment manufacturers maintenance checklist competed? <br /> In the Section ow,describe how and when these de ciencies were or will be corrected. <br /> G. Comments: <br /> Monitoring System Certification Page 3 of 4 12107 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.