My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PEZZI
>
7007
>
3500 - Local Oversight Program
>
PR0545654
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:55:18 AM
Creation date
5/7/2020 11:47:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545654
PE
3528
FACILITY_ID
FA0002499
FACILITY_NAME
LINDEN USD-WATERLOO ELEMENTARY
STREET_NUMBER
7007
Direction
N
STREET_NAME
PEZZI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08906065
CURRENT_STATUS
02
SITE_LOCATION
7007 N PEZZI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V <br /> Existing Gude <br /> JILI <br /> Vault box with locking security <br /> Con c rete <br /> w <br /> 4 <br /> iS <br /> w <br /> r." <br /> h" Cement Grout <br /> w <br /> ilL <br /> w <br /> w "w <br /> Notes: <br /> Groundwater is anticipated to 2-inch SCh. 40 PVC Blank <br /> occur at about 100 fillet w -� <br /> below surface. w Casing Centralizers <br /> w- . <br /> w <br /> Borehole will be advanced 15 feet <br /> into groundwater or to the aqultard w ". <br /> whichever is encountered first Bentonite Clay, typ. 2-feet thick <br /> 5' <br /> Sand pack, nominal 2112, extended <br /> 0 about 2-feet above top of slots <br /> Aquifer 2-inch Sch. 40 PVC, <br /> nominal 0.020" slots <br /> 9 <br /> Sch. 40 PVC endcap <br /> 117 <br /> .Aquktard <br /> Borehole, <br /> Note: This well detail is Whernatic only, The actual nominal 8" diameter <br /> monitoring well construction will be modified to field <br /> conditions in the exploratory borehole. Well slots <br /> will be raised to observe seasonal groundwater <br /> fluctuations for separate phase product to <br /> the point where well seals are not compromiser!. Monitoring Well Schematic Project No. 4062-R <br /> Modifications may also be made prior <br /> to installation by regulatory requirement. Scale: None <br /> Linden/Waterloo School Date: June, 1995 <br /> 7007 Pezzi Road <br /> Stockton,CA Figure 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.