My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012619
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PEZZI
>
7007
>
3500 - Local Oversight Program
>
PR0545654
>
ARCHIVED REPORTS_XR0012619
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:58:49 AM
Creation date
5/7/2020 11:54:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012619
RECORD_ID
PR0545654
PE
3528
FACILITY_ID
FA0002499
FACILITY_NAME
LINDEN USD-WATERLOO ELEMENTARY
STREET_NUMBER
7007
Direction
N
STREET_NAME
PEZZI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08906065
CURRENT_STATUS
02
SITE_LOCATION
7007 N PEZZI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l.R <br /> p� <br /> t..i WaterViork <br /> Health and Safety Plan <br /> Underground Tank Investigation <br /> i . <br /> .IA <br /> is <br /> INTRODUCTION <br /> PURPOSE AND SCOPE <br /> E� <br /> The Health and Safety Plan, for underground tank investigations, <br /> provides for the <br /> Protection of an-site personnel and the <br /> surrounding community during site characterization acti.•ri,ties. <br /> The requirements, specifications and procedures presented with <br /> this plan will apply to all personnel on-site, including <br /> employees, sub-contractors, site visitors and regulatory agency <br /> personnel. <br /> KEY PERSONNEL <br /> WaterWork's Safety Coordinator/Project Manager will <br /> training to site personnel in the use of safe provide <br /> t. safety and personal <br /> protection equipment and will manage the on-site monitoring <br /> r, Program. The Safety Coordinator/Project Manager will have the <br /> authority to deny access to any individual without the proper <br /> training or protective equipment re <br /> or those individuals disregarding site safe the site conditions <br /> safety procedures. All <br /> site personnel Will be under the direction of the Safety <br /> Coordinator/Project Manager. <br /> HAZARD ANALYSIS <br /> The property previously operated a gasoline and/or diesel fuel <br /> distribution facility. Historic data and evaluation of <br /> subsurface indicate the presence or potential presence of <br /> hydrocarbon fuel contaminatian. <br /> The activities addressed by this safety plan include surface and <br /> subsurface soil and groundwater sample collection. The3e <br /> activities present the potential for exposure to toxic materials <br /> through both skin contact and inhalation. The subsurface <br /> _> va <br /> sampling <br /> may also pose a fire and explosion hazard from gases and <br /> p trapped beneath the ground surface. <br />
The URL can be used to link to this page
Your browser does not support the video tag.