Laserfiche WebLink
City of Stockton Pira Station f!G ACAMA <br /> Soil Remediation Plan <br /> Site Code 1013 <br /> June 24, 1992 <br /> Page 5 j <br /> d <br /> n p <br /> i <br /> Report Preparation <br /> Upon completion of field activities and receipt of laboratory analysis, RESNA will prepare a ` <br /> technical report summarizing field methods and data collected during the remediation/excavation <br /> if appropriate, this report will be incorporated into the next quarterly monitoring report in the i <br /> second 1992 quarterly report due in July of 1992. <br /> Field -work proposed in this workplan will be performed according to the Site's Quality <br /> Assurance/Quality Control guidelines and Health and Safety Plan included in Attachments I and <br /> I1, respectively. <br /> RESNA is prepared to begin work in accordance with this workplan within two weeks of agency <br /> approval. If you have any questions or concerns regarding this addendum or project, please <br /> contact John P. Lane at (209) 838-3507, at your earliest convenience. <br /> Respectfully, <br /> RESNA Industries, Inc. <br /> SAN JOAQUIN COUNTY9 <br /> i <br /> PUBLIC HEALTH SERVICE$ 3 <br /> 4 gNVIRONMENTAL HEALTH DIVISION <br /> BOX 2D09, STOCKTON,CA 95021 <br /> Tom J. Lutterman PHON E: (209).468-342.0 <br /> Staff Geologist <br /> ��oved <br /> E3 Approved with changes. See Remarks <br /> ?hn P. Lane <br /> Project Geologist A Pisappr ved; See Remar <br /> Remarks 1 <br /> 1 <br /> Gregory P. Stahl Date _ Y CA Registered Geologist No. 5023 <br /> 'Approval of these plans extends only to that <br /> which is shown and described hereon but <br /> TJL/ggk does not authorize or approve #ny omission <br /> or deviation of requirements of State laws CW <br /> PC: Mr. Jim Escobar local Ordinances. <br /> Mr. James B. Giottonini <br /> SFs492.71L <br />