Laserfiche WebLink
�A <br /> .ti <br /> 2.8 proximity of private, municipal and irrigation wells: <br /> if needed, a survey of all active, inactive and destroyed water <br /> supply and monitoring wells within a one-half mile radius of the <br /> project site will be conducted. <br /> 2,9 Locations of nearby septic tanks and underground utilities: <br /> underground utilities and septic tank to USA)nal l eb�nknown at <br /> ed <br /> this time. Underground service Alert <br /> prior to drilling and will identify the locations of underground <br /> utilities. <br /> 2.10 Distance to adjacent buildings and their water/sewer lines: <br /> The nearest building to the tank pit area is indicated or, <br /> Figure 2. <br /> 3.0 pROpbgED S40RKPLAN ure plans and reports will prepared <br /> Water Qualitt <br /> This workplan and all fut <br /> in accordance with California Regional y Control <br /> Board guidelines and will be certified by a California Registered <br /> Geologist or Registered Civil Engineer. <br /> WeterWor <br /> Based on the available information, s Pn°� °ate to suppls to e <br /> the drilling and sampling of two soil boring <br /> efinition of -the lerl and <br /> ment existing t f sol contaminand ation t the site. One o£a these <br /> vertical extent <br /> borings will <br /> subsequently be deepened and <br /> d ndicats a gionnof <br /> water monitoring well -to provide a preliminary well will be located <br /> groundwater contamination. The monitoringhe <br /> in the assumed do d g eldlient dirnstape shown totank pit. <br /> n gu e 3 <br /> proposed g a <br /> Following completion of the proposed work a Problem Assessment <br /> Report will be prepared and submitted. This report will detail <br /> site history and contamination provide assessment <br /> definitions ofthe <br /> present analytical results; will roundvrater contamina- <br /> lateral and vertical eaten estionsOf lfornadditional investigation, <br /> tion, and will include sugg <br /> or any appropriate remedial action alternatives. <br /> 3.1 Workscope/methodology: <br /> The following scope of work is proposed: <br /> 1, } Two soil borings will be drilled at the approximate loca- <br /> Ant3.ci ated depth of the borings is <br /> tions shown on Figure 3. rade or to saturated soil, whichev- <br /> approximately 40 feet below g <br /> er is shallower. One of the borings will srbtable tan <br /> ened to a depth of d bwillebe <br /> feet below the <br /> water monitoring well.. This well will be <br /> completed as a ground <br /> 3 <br />