Laserfiche WebLink
y � <br /> A <br /> �Y <br /> water_work Corporation <br /> Qualit Assuf ranne and Qua <br /> lit Control_� Plan <br /> uality Assurance/Quality Control <br /> intended to facilitate the acquisition of <br /> The Remedial <br /> am Investigation (RI) Q gathered during <br /> (QA/QC) p g Environmental data 9 rocedures <br /> accurate and reliable data. analyzed following procedures <br /> the RI will be coll.ectedCori dol Program. A Quality Control <br /> prescribed in the Quality <br /> rp rams are necessary to provide <br /> Program has been established � agssure that the Qua 11 laboratory <br /> Program is effective• atians and <br /> The following field and laboratory procedures will be <br /> a�:curate data and documentation for investig <br /> analyses. C objectives are met. <br /> implemented to ensure that QA/QC <br /> 1.0 Recording of Field Data <br /> tinent to the field investigation will be <br /> All information per book. Information to be documented <br /> kept in a field log <br /> includes at least the following: <br /> Sample numbers <br /> - Locations of sample collection <br /> - Soil boring or well numbers, as applicable <br /> Depths at which samples were obtained <br /> r <br /> , a�aas of collectors <br /> Dates and times of collection <br /> Purpose of sample etc. ) <br /> sample distribution (e.g- <br /> Field observations H, <br /> Field measurements (e.g. , <br /> PID readings, p <br /> conductivity, water levels) . <br /> Other data records (e.g• development log, soil sampling <br /> report, well log, etc. ) <br /> 2,0 Sample Containers lied by <br /> laced in containers Supplied <br /> Groundwater samples will be placed <br /> 1 summarizes the req <br /> the analytical laboratory. <br /> sample containers. <br />