My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012620
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PICARDY
>
1501
>
3500 - Local Oversight Program
>
PR0545655
>
ARCHIVED REPORTS_XR0012620
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 12:18:59 PM
Creation date
5/7/2020 12:06:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012620
RECORD_ID
PR0545655
PE
3528
FACILITY_ID
FA0009789
FACILITY_NAME
CITY OF STOCKTON FIRE STATION #6
STREET_NUMBER
1501
STREET_NAME
PICARDY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
APN
13515001
CURRENT_STATUS
02
SITE_LOCATION
1501 PICARDY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sampling, latex gloves will be <br /> worn to prevent- cross <br /> contamination with other samples. One, pair of c]isp°sable <br /> gloves will be dedicated to each sample Collect ccyylinder will <br /> ollected, each end of the <br /> be sealed with aluminum foil or teflon tape and t <br /> hen capped <br /> Duce the sample is cThe sample <br /> with a polyethylene lid, taped, and labeled. <br /> will then be individually sealed in a zipZack bag and <br /> immediately placed in an ice chest containing dry ice or <br /> to a state certified <br /> frozen chemical ice far delivery storage <br /> laboratory. <br /> Sample identification, previous <br /> transportation will be conducted as outlined in the <br /> section. <br /> 1x.3 Sampling from Soil Piles or Shallow Soil fits <br /> collected and transported from <br /> Sail samples will be previous <br /> a backhoe will not be utilized. if <br /> excavated material in the manner described in will <br /> section, however, four brass cylinders <br /> les are collected,cbic yards of material to be <br /> composite ed for every regulatory <br /> be collected ecified by the lead the state <br /> sampled unless otherwise sP composited by <br /> agency. The samples will be <br /> certified analytical laboratory personnelprior to testing• <br /> 12,0 Groundwater Sampling protocol all sampling <br /> prior to arriving at the sampling site, <br /> will be washed with laboratory grade detergent, <br /> equipment water, once with acetone, and once <br /> and rinsed twice with tapThis procedure will be carried out <br /> more <br /> with deionized water. h other monitoring wells, ling <br /> on-site before a p ingto be sampled with the same same <br /> than one well <br /> device. in <br /> riot to sampling, the depth to water (DTW) <br /> immediately �' The thickness of product on top <br /> the well will be recorded•resent, will be measuised using rented <br /> of the groundwater, if p for ma <br /> interface probe. The procedure protocol) . <br /> in Section 9.0 (Groundwater Monitoring <br /> ted, analysis of groundwater at the <br /> detected, A <br /> If free product is duct will not be conducted. <br /> interface for dissolved Pro <br /> product <br /> sample will be collected for sOancintervalfspecific <br /> r all free product cannot be removed, sample from <br /> sampling device may be utilized to collect a <br /> below the zone of free product. Before collecting w least <br /> groundwater samples from each well, the well will be <br /> two g parameters <br /> (temperature, conductivity <br /> purged until indicator P The <br /> and pH) stabilize. This will entail iling the <br /> pumping. at leas <br /> four well rasing volumes by volumes and temporary <br /> criteria forSection 10-0, <br /> determining well casing (Well <br /> storage of purged water is outlined inarameter measurements <br /> Development protocol)• <br /> The indicator p of each well <br /> will be taken both before and after Purging <br />
The URL can be used to link to this page
Your browser does not support the video tag.