Laserfiche WebLink
San Joaquin County <br /> O PQ u N <br /> DIRECTOR <br /> Environmental <br /> ._ ..o Environmental Health DepartmentDonna Heran,REHS <br /> 600 East Main Street <br /> Q; { PROGRAM COORDINATORS <br /> W. I {LIIrII�- Stockton, California 95202-3029 Robert McClellon, REHS <br /> _ Jeff Carruesco, REHS,RDI <br /> Kasey Foley,REHS <br /> Website: www.sjgov.org/ehd <br /> 4��Fo•R� <br /> Phone: (209)468-3420 <br /> Fax: (209) 464-0138 <br /> May 7, 2010 <br /> Mrs. Edna Moore <br /> 3400 Wagner Heights Road <br /> Apartment 346 <br /> Stockton, California 95209 <br /> Subject: Moore Truck Lines <br /> 3400 Newton Road <br /> Stockton, California 95205 <br /> Dear Mrs. Moore: <br /> By letter dated July 22, 2009, the San Joaquin County Environmental Health Department <br /> (EHD) directed the semi-annual collection of groundwater samples from monitoring well <br /> MW-1; the annual collection of groundwater samples from MW-5, MW-6, MW-7, MW-8, and <br /> domestic well DW-1; and the suspension of collecting groundwater samples from MW-2, <br /> MW-3 and MW-4. Based on the electronic submittals to GeoTracker - the State Water <br /> Resources Control Board database program, the last time groundwater samples were <br /> collected at the above-referenced site was in February 2009. Included in this same letter, the <br /> EHD directed the submittal of a soil vapor evaluation. To date, the EHD has not received this <br /> evaluation. <br /> By letter dated July 29, 2009, the EHD approved a work plan titled Soil Vapor Extraction Pilot <br /> Study Work Plan, dated October 20, 2008, prepared by Advanced GeoEnvironmental, Inc. <br /> (AGE) on your behalf for the above-subject site. In the work plan, AGE proposed to conduct a <br /> twenty-four-hour soil vapor extraction (SVE) pilot test using monitoring wells MW-1 and MW-8 <br /> as extraction wells. To date, the SVE pilot test has not been completed. <br /> You are directed to complete the SVE pilot test within thirty days of the date of this letter and <br /> submit the report of findings to the EHD within thirty days of completing the SVE pilot test. <br /> Monitor all wells and collect groundwater samples from monitoring wells MW-1 and MW-5 <br /> through MW-8 during the second quarter 2010, and resume the semi-annual collection of <br /> groundwater samples from MW-1. Lastly, suiamit the vapor intrusion evaluation to the EHD <br /> by August 5, 2010. <br /> If you have any questions regarding this letter, please contact Vicki McCartney at (209) 468- <br /> 9852 or by e-mail at vmccartney(o_)sicehd.com. <br />