My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
18700
>
2900 - Site Mitigation Program
>
PR0541559
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:08:53 PM
Creation date
5/7/2020 3:01:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0541559
PE
2965
FACILITY_ID
FA0023827
FACILITY_NAME
MCMANIS FAMILY VINEYARDS
STREET_NUMBER
18700
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24522020
CURRENT_STATUS
01
SITE_LOCATION
18700 E RIVER RD
P_LOCATION
05
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t r Quality Control Board <br /> California Regional Wae Q y <br /> Central Valley Region <br /> Steven T.Butler,Chair <br /> Winston H.Hickox Gray Davis <br /> Secretaryfor Sacramento Main Office Governor <br /> Environmental Internet Address: http://www.swrcb.ca.gov/--rwgcb5 <br /> Protection 3443 Routier Road,Suite A,Sacramento,California 95827-3003 <br /> Phone(916)255-3000•FAX(916)255-3015 <br /> ITEMS TO BE INCLUDED IN A <br /> MONITORING WELL INSTALLATION WORKPLAN AND A <br /> MONITORING WELL INSTALLATION REPORT OF RESULTS <br /> Prior to installation of groundwater monitoring wells, the Discharger shall submit a workplan containing <br /> the minimum listed information. Wells may be installed after staff approve the workplan. Upon <br /> installation of the monitoring wells, the Discharger shall submit a report of results, as described below. <br /> All workplans and reports must be signed by a registered geologist, certified engineering geologist, or <br /> civil engineer registered or certified by the State of California. <br /> Monitoring Well Installation Workplan <br /> A. General Information: <br /> Monitoring well locations and rationale <br /> Survey details <br /> Equipment decontamination procedures <br /> Health and safety plan <br /> Topographic map showing any existing monitoring wells,proposed wells, waste handling <br /> r facilities, utilities, and other major physical and man-made features. <br /> B. Drilling Details: describe drilling and logging methods <br /> C. Monitoring Well Design: <br /> Casing diameter <br /> Borehole diameter <br /> Depth of surface seal <br /> Well construction materials <br /> Diagram of well construction <br /> Type of well cap <br /> Size of perforations and rationale <br /> Grain size.of sand pack and rationale <br /> Thickness and position of bentonite seal and sand pack <br /> Depth of well, length and position of perforated interval <br /> D. Well Development: <br /> Method of development to be used <br /> Method of determining when development is complete <br /> Method of development water disposal <br /> E. Surveying Details: discuss how each well will be surveyed to a common reference point <br /> California Environmental Protection Agenev <br /> C-.1y D..weenUl5DOL1N5M1TROm.eweil_.^VW.. . <br /> �p�Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.