Laserfiche WebLink
LI;sa Vale .6Ju +.�..WUn`xy- 209 468 <br /> 2999 P.02 <br /> FLAG CITY WWTP START-L"P PLAN w <br /> L OVERVIEW <br /> The intent of this plan is to describe the sequcncm9 anvoived with starting and tradng <br /> the various plant systems and equipment These systems are the Submorsibie pumps, <br /> the Acro-Mod [tit d asoated °4uip�k the Parkwa filter&W air Compressor. the <br /> chemicals g and the olwtsicsi and instrumentation s <br /> should be noted that some of Ute instrun=tati0n falls under the me"`- It <br /> area of IeSponsibility and not Pranim tic. In thcge instances thePttrertt sttppiitsrs <br /> representatives +gill be tasked with perfa ming an equipment <br /> y requited testing. <br /> Fack1y r=Pr=entatives will test the submersible pumps, the Aero-Mod equipment, the <br /> PArk5Oelactric Filter and air compressor, the diesel generator. the chemical system and the <br /> eiecnir,Rt and tnstrumen on sySlern, A fir, representative wilt not inSpeet the <br /> sampler- Training will not be conducted on the filter air compressor, the sampler or <br /> m <br /> the laboratory equipetL <br /> The plant systeans as descrIbed above will be wsred individually prior to testing the <br /> plant as a whole. All of the testing describes herein will be done with chi water and <br /> will be discharged to the vudf.ff line as necessary_ We will cornnxrtcc <br /> aeration basin, clarifier and d & the <br /> tgcster with [lean water an Monday, February 27. <br /> U. SuBbCERSIEi S PiTlies <br /> Raw Sewage Pump Station pumps_ <br /> We will fill the pump station with water from the on-site hydrants and pump rho water <br /> to the aeration basin altc=tCly using each of the three pumps. Any excess water <br /> Placed in the aeration basin will be pumped with the filter fend pumps during the <br /> testing of these pumps. <br /> Filter Feed Pumps: <br /> The filter feed pumps will be tested by pumping watrr from the effluent tank to the <br /> contact basin -Aa the filter bypass lime. <br /> We anti mPatc testing to take two hours. Operator training will be conducted fallowing <br /> pump testing. <br /> r-. <br />